1206 Arrowhill Road
Houston, TX 77077 · City Of Houston
Groundwater facility upgrades at 1206 Arrowhill Road
Improvements to Houston’s District 175 groundwater facility were registered on February 11, 2024. The work includes replacing pumps and above-ground piping, rehabilitating the pump station interior and concrete pads, and upgrading ventilation and electrical systems. The applicant’s estimated project cost is $3,747,400.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 11, 2024
- since Feb 11, 2024
- Largest scope
- 3,760 sf
- Estimated cost
- $3.7M
- state registration
Where this project stands
In state plan reviewGround Water Facility/Re-Pump Station/HVAC & Ventilation System Impvmts PKG 2 District 175 GW Fac
3,760 sq ft · $3.7M est.
- RegisteredFeb 11, 2024
- Plan reviewnow
- ConstructionJul '24 – Oct '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectReplace two pumps, install new booster pump. paint interior walls and doors. replace above ground piping, valves, and flowmeters. rehabilitate interior ceiling of pump station and concrete pads. replace louvers, fans. electrical work — district 175 groundwater facility
TDLR project registrationRenovation/AlterationProject Registered3,760 sq ft$3.7M est.- Project #
- TABS2024011293
- Tenant / owner
- Ground Water Facility/Re-Pump Station/Hvac & Ventilation System Impvmts Pkg 2 District 175 Gw Fac
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1206 Arrowhill Road
What is being built at 1206 Arrowhill Road?
The project is a renovation of a City of Houston District 175 groundwater facility, not a new building. Work includes replacing pumps and piping and improving the pump station’s interior, ventilation, and electrical systems.
Is a new building planned at 1206 Arrowhill Road?
The TDLR registration describes renovation and alteration work at an existing groundwater facility. It does not describe a new building.
When was the groundwater facility project registered?
The project was registered on February 11, 2024, under TDLR project number TABS2024011293.
What work is planned at the District 175 groundwater facility?
The registered scope includes replacing two pumps and installing a booster pump, along with replacing above-ground piping, valves, and flowmeters. It also includes interior, concrete pad, ventilation, and electrical work.
How much will the 1206 Arrowhill Road project cost?
The applicant’s estimated cost for the project is $3,747,400, according to the TDLR registration filed February 11, 2024.
Who owns or operates the facility at 1206 Arrowhill Road?
The project record lists the City of Houston as the owner or occupant and describes the site as a District 175 groundwater facility.