Historic · latest filing Mar 2024Commercial

14311 Grisby Road

Houston, TX 77079 · City Of Houston

Houston groundwater facility upgrades registered in 2024

A City of Houston groundwater facility and re-pump station at 14311 Grisby Road is slated for equipment and building upgrades. A TDLR project registration dated March 11, 2024, describes replacing pumps, piping, valves, the roof, louvers and exhaust fans, along with electrical work and demolition of an existing diesel tank and concrete pads. The applicant’s estimated project cost is $1,706,800.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 11, 2024

Projects
1
1 filings
Latest filing
Mar 11, 2024
since Mar 11, 2024
Largest scope
876 sf
Estimated cost
$1.7M
state registration

Where this project stands

In state plan review

Ground Water Facility/Re-Pump Station/HVAC & Ventilation System Impvmts PKG 3 District 21

876 sq ft · $1.7M est.

  1. RegisteredMar 11, 2024
  2. Plan reviewnow
  3. ConstructionJul '24 – Oct '25
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Replace roof on mcc/chlorine building, replace pumps, piping, valves, replace louvers and exhaust fans, painting. demolish existing diesel tank, drive motor, and concrete pads. electrical work. — district 21 groundwater facility

    TDLR project registrationRenovation/AlterationProject Registered876 sq ft$1.7M est.
    Tenant / owner
    Ground Water Facility/Re-Pump Station/Hvac & Ventilation System Impvmts Pkg 3 District 21
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 14311 Grisby Road

What is being built at 14311 Grisby Road?

The TDLR registration describes renovation work at a City of Houston groundwater facility and re-pump station, including pump and piping replacements, roof work, and electrical work. It was registered March 11, 2024, as project TABS2024013543.

Is a new building planned at 14311 Grisby Road?

The registration describes renovation and alteration work, not a new building. The scope includes replacing equipment and building components and demolishing an existing diesel tank and concrete pads.

What work is planned at the Grisby Road groundwater facility?

The registered scope includes replacing pumps, piping, valves, the roof on the MCC/chlorine building, louvers and exhaust fans, plus painting and electrical work. It also includes demolition of an existing diesel tank, drive motor and concrete pads.

When was the 14311 Grisby Road project permitted?

The project was registered with the Texas Department of Licensing and Regulation on March 11, 2024. Its registration number is TABS2024013543.

How much will the Grisby Road groundwater facility project cost?

The applicant’s estimated cost in the TDLR registration is $1,706,800. This is an estimate for the project, not a confirmed final cost.

What work is planned near Common Corridor Renovation on N Barkers Landing Road?

About 128 meters from Common Corridor Renovation, the City of Houston groundwater facility at 14311 Grisby Road has a registered renovation project. The March 11, 2024, registration covers equipment, roof, ventilation and electrical improvements.

Also being built nearby

All of 77079

More demolitions in 77079.

Email me when plan review is complete