3602 Hollister Road
Houston, TX 77080 · Spring Branch ISD
Hollibrook Elementary vestibule renovation registered in 2024
A 779-square-foot renovation to the entry vestibule at Hollibrook Elementary School was registered with the Texas Department of Licensing and Regulation on October 28, 2024. The applicant estimated the project cost at $200,000; the TDLR record lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 28, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2024
- since Oct 28, 2024
- Largest scope
- 779 sf
- Estimated cost
- $200K
- state registration
Where this project stands
CompletedHollibrook ES Vestibule Renovation
779 sq ft · $200K est.
- RegisteredOct 28, 2024
- Plan review
- ConstructionJun '25 – Aug '25
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation to entry vestibule of existing elementary school — hollibrook elementary school
TDLR project registrationRenovation/AlterationProject Closed779 sq ft$200K est.- Project #
- TABS2025004176
- Tenant / owner
- Hollibrook Es Vestibule Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3602 Hollister Road
What is being renovated at 3602 Hollister Road?
The TDLR registration describes a renovation to the entry vestibule of Hollibrook Elementary School. The project covers 779 square feet.
When was the Hollibrook Elementary vestibule project filed?
The project was registered with TDLR on October 28, 2024. Its registration number is TABS2025004176.
How much will the Hollibrook vestibule renovation cost?
The applicant estimated the project cost at $200,000 in the TDLR registration. This is an estimate, not a confirmed final cost.
Is the Hollibrook Elementary renovation complete?
The TDLR record lists the project status as closed. It describes a 779-square-foot entry vestibule renovation.
What is being built near Spring Branch ISD/Hollibrook Elementary?
The project at 3602 Hollister Road is a renovation to Hollibrook Elementary's entry vestibule, registered on October 28, 2024.
Also being built nearby
All of 77080- 8802 Sonneville DrOct 15, 2019Imelda storm damage residential flood damage repairs · 52 m away
- 8742 Sonneville DrDec 27, 2023Residential repairs as per list · 70 m away
- 3622 Colleen Woods CirMar 1, 2019Residential new detached patio cover · 144 m away
- 3310 Knoll StDec 3, 2019Residential storm damage repairs · 148 m away
- 3305 Cameo DrJun 11, 2020Repair foundation, s. family residential 3-b · 161 m away
- 3311 Knoll StOct 11, 2019Residential fire damage repair ( f/d 2%) · 184 m away
- 3602 Hollister St · Spring Branch ISD/Hollibrook ElemJun 12, 2025815 sq ft school security vestibule/ lobby remodel · 197 m away
- 3406 Mona Lee LnDec 6, 2021Residential repair per spec list · 212 m away
- 3503 Mona Lee LnNov 12, 2019Residential repair per spec list · 267 m away
- 3209 Elegia DrNov 4, 2020Residential repairs per spec list · 270 m away
- 3706 Mona Lee LnJul 21, 2022Addition cover patio residential single family · 277 m away
- 3214 Elegia DrJan 31, 2020Residential repairs / per spec list · 293 m away