7555 Howell Sugar Land Rd
Houston, TX 77083 · Alief ISD
Taylor High School track and field replacement
Taylor High School’s track and field are slated for renovation at 7555 Howell Sugar Land Road in Houston. The Texas Department of Licensing and Regulation registered the project on April 12, 2024, with an applicant-estimated cost of $2.5 million. The registration describes a new track surface, replacement field turf and drainage, and resurfacing work at the northern long jump area.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 12, 2024
- since Apr 12, 2024
- Largest scope
- 156,100 sf
- Estimated cost
- $2.5M
- state registration
Where this project stands
CompletedTaylor High School Track & Field Replacement
156,100 sq ft · $2.5M est.
- RegisteredApr 12, 2024
- Plan review
- ConstructionMay '24 – Jan '25
- Inspected
- Closed
Ran as a 8-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRepaving the track surface, existing foundation to stay. new "d zones" with track surface. field replacement with syntenic turf system with new drainage system. northern long jump will be resurfaced. existing sand long jump pit will remain. — taylor high school
TDLR project registrationRenovation/AlterationProject Closed156,100 sq ft$2.5M est.- Project #
- TABS2024016088
- Tenant / owner
- Taylor High School Track & Field Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7555 Howell Sugar Land Rd
What is being built at 7555 Howell Sugar Land Road?
A track and field renovation is registered for Taylor High School at this address. The project registration, TABS2024016088, was filed April 12, 2024.
Is Taylor High School getting a new track?
The project description says the track surface will be repaved while the existing foundation remains. It also includes new track surface in the D zones.
Is Taylor High School getting a new football field?
The registration describes a field replacement with a turf system and a new drainage system. It does not specify the field’s use.
What is changing at the long jump area at Taylor High School?
The northern long jump area is to be resurfaced. The existing sand long jump pit is to remain, according to the project description.
When was the Taylor High School track project filed?
The TDLR project registration was filed April 12, 2024. Its status is listed as Project Closed.
How much will the Taylor High School track and field project cost?
The applicant’s estimated cost in the TDLR registration is $2.5 million. This is an estimate for the project, not a confirmed final cost.