groundranger
Historic · latest filing Apr 2024Commercial

7555 Howell Sugar Land Rd

Houston, TX 77083 · Alief ISD

Taylor High School track and field replacement

Taylor High School’s track and field are slated for renovation at 7555 Howell Sugar Land Road in Houston. The Texas Department of Licensing and Regulation registered the project on April 12, 2024, with an applicant-estimated cost of $2.5 million. The registration describes a new track surface, replacement field turf and drainage, and resurfacing work at the northern long jump area.

Summarized from Texas Department of Licensing and Regulation records · updated Apr 12, 2024

Projects
1
1 filings
Latest filing
Apr 12, 2024
since Apr 12, 2024
Largest scope
156,100 sf
Estimated cost
$2.5M
state registration

Where this project stands

Completed

Taylor High School Track & Field Replacement

156,100 sq ft · $2.5M est.

  1. RegisteredApr 12, 2024
  2. Plan review
  3. ConstructionMay '24 – Jan '25
  4. Inspected
  5. Closed

Ran as a 8-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Repaving the track surface, existing foundation to stay. new "d zones" with track surface. field replacement with syntenic turf system with new drainage system. northern long jump will be resurfaced. existing sand long jump pit will remain. — taylor high school

    TDLR project registrationRenovation/AlterationProject Closed156,100 sq ft$2.5M est.
    Tenant / owner
    Taylor High School Track & Field Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 7555 Howell Sugar Land Rd

What is being built at 7555 Howell Sugar Land Road?

A track and field renovation is registered for Taylor High School at this address. The project registration, TABS2024016088, was filed April 12, 2024.

Is Taylor High School getting a new track?

The project description says the track surface will be repaved while the existing foundation remains. It also includes new track surface in the D zones.

Is Taylor High School getting a new football field?

The registration describes a field replacement with a turf system and a new drainage system. It does not specify the field’s use.

What is changing at the long jump area at Taylor High School?

The northern long jump area is to be resurfaced. The existing sand long jump pit is to remain, according to the project description.

When was the Taylor High School track project filed?

The TDLR project registration was filed April 12, 2024. Its status is listed as Project Closed.

How much will the Taylor High School track and field project cost?

The applicant’s estimated cost in the TDLR registration is $2.5 million. This is an estimate for the project, not a confirmed final cost.

More schools & daycares in 77083.

Get alerts for 7555 Howell Sugar Land Rd