10777 Blackhawk Blvd
Houston, TX 77089 · Harris County
Southbelt Trail pavement replacement in Houston
Harris County registered a project to replace asphalt pavement with concrete on the Southbelt hike and bike trail at 10777 Blackhawk Blvd. The TDLR registration was filed April 30, 2024, and lists 67,500 square feet and an estimated project cost of $737,571; its status is closed.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 30, 2024
- since Apr 30, 2024
- Largest scope
- 67,500 sf
- Estimated cost
- $738K
- state registration
Where this project stands
CompletedHike and Bike Trail - Southbelt Trail - 2023
67,500 sq ft · $738K est.
- RegisteredApr 30, 2024
- Plan review
- ConstructionJun '24 – Nov '24
- Inspected
- Closed
Ran as a 6-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRemoval and replacement of asphalt pavement with concrete pavement on the hike and bike trail — southbelt hike & bike trail
TDLR project registrationRenovation/AlterationProject Closed67,500 sq ft$738K est.- Project #
- TABS2024017382
- Tenant / owner
- Hike And Bike Trail - Southbelt Trail - 2023
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 10777 Blackhawk Blvd
What is being built at 10777 Blackhawk Blvd?
TDLR records describe removal and replacement of asphalt pavement with concrete on the Southbelt hike and bike trail. The project is listed as a renovation and alteration, not a new trail.
When was the Southbelt Trail project permitted?
The TDLR project registration was filed April 30, 2024. Its project number is TABS2024017382.
How much of the Southbelt Trail is being resurfaced?
The TDLR registration lists 67,500 square feet for the project, which covers asphalt pavement removal and concrete pavement replacement.
How much will the Southbelt Trail work cost?
The registration lists an estimated project cost of $737,571. This is the estimate recorded for the project, not a final cost figure.
What's happening near Sagemeadow Utility District on Hall Road?
A project registered for the Southbelt hike and bike trail at 10777 Blackhawk Blvd, about 147 meters from Sagemeadow Utility District, involves replacing asphalt pavement with concrete. The registration was filed April 30, 2024.
Also being built nearby
All of 77089- 10755 Hall Rd · Sagemeadow Utility DistrictMay 13, 2025Sagemeadow utility district — renovation/alteration — alterations · 147 m away
- 10822 Sagecanyon DrNov 16, 2017New deck at residence & remodel · 362 m away
- 10830 Sagecanyon DrMay 12, 2025Residential repair per spec list · 368 m away
- 10815 Sagecanyon DrJul 2, 2019Residential foundation repair · 374 m away
- 10806 Sagebluff DrAug 4, 2017Residential repair as per spec sheet · 447 m away
- 11006 Sagecanyon DrFeb 8, 2018Residential solar panel addition · 509 m away
- 9926 Sagebud LnFeb 2, 2018Residential repairs per spec. list · 509 m away
- 10910 Sagetrail DrMar 2, 2021Residential repair · 554 m away
- 11219 Sageyork Dr · Harris CountyFeb 3, 2026Hike & bike trail - sagemeadow park 2023 — renovation/alteration — removal of existing asphalt trail and construction of 16,390 sq ft hike and bike trail at sagemeadow park · 559 m away
- 11102 Sagecanyon DrJun 10, 2025Residential fire damage garage add./remodel · 568 m away
- 11210 Sageyork DrMay 13, 2021Residential one-stop foundation repair, 12 · 587 m away
- 11115 Sagecanyon DrJun 7, 2017Residential repairs per spec list · 595 m away