groundranger
Historic · latest filing Apr 2024Commercial

16005 Katy Fwy

Houston, TX 77094 · City Of Houston

Houston groundwater facility upgrades planned at 16005 Katy Fwy

Renovations to the City of Houston’s Memorial West groundwater facility and re-pump station were registered on April 4, 2024. The work includes replacing pumps, motors, valves and flow meters, along with HVAC, electrical, drainage and exterior improvements. The applicant’s estimated project cost is $2,382,900.

Summarized from City of Houston, Texas Department of Licensing and Regulation records · updated Apr 4, 2024

Projects
2
2 filings
Latest filing
Apr 4, 2024
since Apr 4, 2024
Largest scope
1,720 sf
Estimated cost
$2.4M
state registration

Where this project stands

Permitted · trades not filed yet

Ground water facility remodel with sitework (m/2)

  1. Building permitOct 29, 2026
  2. Trade permits
  3. Occupancy

Plumbing, electrical and fire subcontractors usually file next.

The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.

Permit & project history

2 projects
  1. Ground water facility remodel with sitework (m/2)

    City of Houston permitBuilding
    Project
    24036135
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

    GROUND WATER FACILITY REMODEL W/ SITEWORK 1-1-2-U-B '21IBC (M/2)

  2. Paint doors, interior and exterior walls, and replace awnings. new concrete driveway, repair front gate, drainage. replace pumps, motors, valves, and flow meters. add window hvac unit, replace louvers and fans. electrical work. — memorial w groundwater facility

    TDLR project registrationRenovation/AlterationProject Registered1,720 sq ft$2.4M est.
    Tenant / owner
    Ground Water Facility/Re-Pump Station/Hvac & Ventilation System Impvmts Pkg 2 Memorial W Gw
    Design firm
    Pro
    Contact
    Pro

Sources: City of Houston · Texas Department of Licensing and Regulation

Questions about 16005 Katy Fwy

What is being built at 16005 Katy Fwy in Houston?

A TDLR registration describes renovation work at the City of Houston’s Memorial West groundwater facility and re-pump station, not a new building. Work includes equipment replacements and HVAC, electrical and site improvements.

When was the groundwater facility project registered?

The project was registered on April 4, 2024, under TDLR number TABS2024015498.

What work is planned at the Memorial West groundwater facility?

The registration lists replacement pumps, motors, valves and flow meters, plus a window HVAC unit, new louvers and fans, and electrical work. It also includes painting, awning replacement, a concrete driveway, gate repairs and drainage work.

How much will the 16005 Katy Freeway project cost?

The applicant’s estimated cost for the project is $2,382,900. This is an estimate for the registered project.

Is a new groundwater facility being built near the EV charging station on Katy Freeway?

The record describes renovations to an existing groundwater facility and re-pump station at 16005 Katy Fwy. An EV charging station is listed at 16015 Katy Fwy, about 221 meters away.

Who is responsible for the work at 16005 Katy Fwy?

The fact sheet identifies the City of Houston as the owner or occupant. The project was registered with the Texas Department of Licensing and Regulation.

Also being built nearby

All of 77094
Email me when trade permits are filed