groundranger
Recent · latest filing Aug 2025Commercial

18500 Katy Freeway

Houston, TX 77094 · Houston Methodist West Cath Lab 2 Equipment Replacement, Houston Methodist West - Linac + 4 more

Medical campus work includes a linear accelerator addition

TDLR registrations show work at the multi-tenant medical site at 18500 Katy Freeway, including a 1,598-square-foot linear accelerator addition registered on Feb. 5, 2024, and renovations to a hospital lab and cath lab. The lab renovation was registered on Dec. 12, 2023, and the cath lab equipment replacement on Aug. 6, 2025; all three registrations list the projects as closed.

Summarized from Texas Department of Licensing and Regulation records · updated Aug 6, 2025

Projects
6
6 filings
Latest filing
Aug 6, 2025
since Feb 5, 2024
Largest scope
1,598 sf
Estimated cost
$4.0M
state registration

Where this project stands

Completed

Houston Methodist West Cath Lab 2 Equipment Replacement

921 sq ft · $744K est.

  1. RegisteredAug 6, 2025
  2. Plan review
  3. ConstructionAug '25 – Oct '25
  4. Inspected
  5. Closed

Ran as a 2-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

6 projects
  1. Interior renovations to an existing cath lab located on level 3. scope includes replacement of imaging equipment, new flooring and new ceiling. — houston methodist west hospital

    TDLR project registrationRenovation/AlterationProject Closed921 sq ft$744K est.
    Tenant / owner
    Houston Methodist West Cath Lab 2 Equipment Replacement
    Design firm
    Pro
    Contact
    Pro
  2. The project consists of addition of a one story, new linear accelerator, type ia building, 1,598 square feet located on the first floor of houston methodist west mob. — houston methodist west

    TDLR project registrationAdditions to Existing BuildingProject Closed1,598 sq ft$4.0M est.
    Tenant / owner
    Houston Methodist West - Linac
    Design firm
    Pro
    Contact
    Pro
  3. HMWH Lab Renovation

    The project scope consists of the renovation of an existing4,117 sq ft hospital lab space that includes the modification and addition of existing millwork, mechanical and plumbing systems, partitions, equipment and finishes. — houston methodist west hospital

    TDLR project registrationRenovation/AlterationProject Closed4,117 sq ft$800K est.
    Tenant / owner
    Hmwh Lab Renovation
    Design firm
    Pro
    Contact
    Pro
  4. HMWH OR Cysto Renovation

    Renovation of two existing operating rooms. work includes the demolition of existing partitions and the construction of new partitions, finishes, mechanical, electrical and plumbing systems. — houston methodist west hospital

    TDLR project registrationRenovation/AlterationProject Closed2,578 sq ft$1.0M est.
    Tenant / owner
    Hmwh Or Cysto Renovation
    Design firm
    Pro
    Contact
    Pro
  5. Renovation of existing 615 sq ft room within the level 03 digestive health dept. of the hmwh campus. scope includes demolition of existing ceilings, finishes and millwork, and the construction and/or relocation of lead lined partitions and mep systems. — houston methodist west hospital

    TDLR project registrationRenovation/AlterationProject Closed617 sq ft$500K est.
    Tenant / owner
    Hmwh Advanced Procedure Room 5
    Design firm
    Pro
    Contact
    Pro
  6. HMWH Corridor Refresh

    Refresh to corridors on level 1 & 3 — houston methodist west hospital

    TDLR project registrationRenovation/AlterationProject Closed4,000 sq ft$600K est.
    Tenant / owner
    Hmwh Corridor Refresh
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 18500 Katy Freeway

What is being built at 18500 Katy Freeway?

TDLR records list a one-story, 1,598-square-foot linear accelerator addition to Houston Methodist West’s medical office building. The records also show renovations to a hospital lab and an existing cath lab.

Is a new hospital building going up at 18500 Katy Freeway?

The registration describes a one-story addition for a linear accelerator, not a new hospital building. The 1,598-square-foot project was registered on Feb. 5, 2024, as TABS2024010810.

What renovations are listed at 18500 Katy Freeway?

A hospital lab renovation registered Dec. 12, 2023, covers an existing 4,117-square-foot lab space. A cath lab equipment replacement registered Aug. 6, 2025, includes new imaging equipment, flooring and ceiling work.

What is happening near Houston Methodist West Hospital on Katy Freeway?

At the multi-tenant medical site at 18500 Katy Freeway, TDLR records list a linear accelerator addition and hospital lab and cath lab renovations. Houston Methodist West Hospital is listed nearby at 18700 Katy Freeway.

How large is the linear accelerator addition at 18500 Katy Freeway?

The TDLR registration lists the addition as 1,598 square feet and places it on the first floor of Houston Methodist West’s medical office building. It was registered Feb. 5, 2024, under TABS2024010810.

Are the projects at 18500 Katy Freeway still underway?

The three TDLR registrations list their status as Project Closed. The most recent registration, for cath lab equipment replacement, was dated Aug. 6, 2025.

Also being built nearby

All of 77094
Get alerts for 18500 Katy Freeway