Camp Logan First Addition partial replat no 5
Washington Avenue Coalition / Memorial Park · 77007 · Harris County
Replat creates two single-family residential lots in 77007
A subdivision replat proposes two lots for single-family residential use in Camp Logan First Addition. Application 2019-2167 was considered by the Planning Commission on December 19, 2019; the records provided do not show a building permit or construction schedule. Silvan Homes, Inc. is listed as the developer.
- Lots
- 2
- Acres
- 0.12
- Next / last hearing
- Dec 19, 2019
- School district
- Houston ISD
Application
Planning Commission history
- December 19, 2019Listed
Questions about Camp Logan First Addition partial replat no 5
What is being built in Camp Logan First Addition?
A subdivision replat proposes two lots for single-family residential use. The records provided do not specify a building design or construction schedule.
How many lots are included in the Camp Logan replat?
The replat covers two lots across 0.1237 acres. It is listed as application 2019-2167.
When was the Camp Logan First Addition replat reviewed?
The Planning Commission date listed for application 2019-2167 is December 19, 2019.
Who is the developer for the Camp Logan replat?
Silvan Homes, Inc. is listed as the developer. Probstfeld & Associates, Inc. is listed as the engineer or surveyor.
What is planned for the Camp Logan site in ZIP code 77007?
The land use listed for the replat is single-family residential on a public street. The record identifies two lots.
Does the Camp Logan replat mean construction has started?
The record describes a subdivision replat, not a construction permit. It does not provide a construction start date.
Other plats in 77007
- Thompson HeightsDec 3, 20261 lots · 0.11 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- RPS Estates at Crockett StreetDec 3, 20262 lots · 0.11 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- Blossom GroveNov 12, 20262 lots · 0.11 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- Houston Avenue SquareOct 15, 20262 lots · 0.11 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- Maxroys CornerSep 17, 20263 lots · 0.11 ac · Single Family Residential (Shared Driveways) · Washington Avenue Coalition / Memorial Park
- Floyd Street ViewsSep 3, 20262 lots · 0.13 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- Houston Residences ParkSep 3, 20262 lots · 0.11 ac · Single Family Residential (Public Street) · Washington Avenue Coalition / Memorial Park
- Homes at Rutland StreetAug 20, 20262 lots · 0.15 ac · Single Family Residential (Public Street) · Greater Heights
Commercial construction in 77007
- 7811 Burleson Rd · Hci Rbp Owner LLCOct 29, 2026Ross business park - building 02 - spec office — renovation/alteration — the scope of work includes a 2,580 sq ft speculative office space build within an existing warehouse space, warehouse lighting, and addition of two dock levelers. total building area is 108,989 sq ft
- 12300 North Freeway · Reep-Ind Citynorth Owner TX LLCOct 27, 2026Greenspoint north — new construction — construction of a new ground-up vacant shell warehouse building. site improvements will be made for a future tenant. the building will be designed with adequate fire department access and fire protection req.s for high piled storage
- 424 E 4th St · Fila PropertiesOct 26, 2026Parking lot light install
- 600 N Shepherd Dr · Popup Bagels MktOct 26, 20261,185 sq ft convert to take out bagel shop 100% sp
- 621 Waverly St · Strong PilatesOct 20, 20262,542 sq ft buildout pilates studio demise
- 8200 Washington Avenue · 8200 Washington Purchase LLCOct 20, 2026Tempo washington - indoor buildout and five outdoor padel courts — renovation/alteration — approx. 2,000 sq ft padel clubhouse and cafe buildout with retail, lounge, storage, restrooms and showers; five outdoor padel courts with foundations, lighting, deck, walkways and drainage/site work. approx. 18,000 sq ft affected