Faulkner Estates
Greater Ost / South Union · 77021 · Harris County
Faulkner Estates replat proposes two residential lots
A 0.1182-acre Class 3 replat in Faulkner Estates proposes two lots for single-family residential use with shared driveways, plus landscape or open-space use. Application 2026-0913 is listed as Submitted; this is a subdivision application, not a building permit.
- Lots
- 2
- Acres
- 0.12
- Next / last hearing
- Aug 6, 2026
- School district
- Houston ISD
Application
Planning Commission history
- June 25, 2026Submitted
- June 25, 2026Submitted
- June 25, 2026Submitted
- June 25, 2026Submitted
- June 25, 2026Submitted
- June 25, 2026Submitted
- June 25, 2026Submitted
- June 25, 2026Submitted
- June 25, 2026Submitted
- June 25, 2026Submitted
- June 25, 2026Submitted
- June 25, 2026Awaiting Completeness
- June 25, 2026Submitted
- June 25, 2026Submitted
- July 9, 2026Submitted
- July 9, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Listed
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
- August 6, 2026Submitted
Questions about Faulkner Estates
What is being proposed in Faulkner Estates in 77021?
A Class 3 subdivision replat proposes two lots for single-family residential use with shared driveways, along with landscape or open-space use. The site is listed as 0.1182 acres.
How many lots are proposed in the Faulkner Estates replat?
The application proposes two lots on 0.1182 acres.
Is application 2026-0913 a building permit?
No. It is a Class 3 subdivision replat application, listed with Submitted status.
What type of homes are proposed in Faulkner Estates?
The listed land use includes single-family residential with shared driveways. The application does not provide building plans or a construction timeline.
What is the status of the Faulkner Estates replat?
Application 2026-0913 is listed as Submitted.
When are the planning commission dates for the Faulkner Estates replat?
The record lists planning commission dates of June 25, July 9 and August 6, 2026. The application status is listed as Submitted.
Which school district serves the Faulkner Estates replat site?
The site is listed in Houston ISD.
Other plats in 77021
- Owais VillasDec 3, 20262 lots · 0.15 ac · Single Family Residential (Public Street) · Greater Ost / South Union
- Eastwood Street VillasDec 3, 20262 lots · 0.18 ac · Single Family Residential (Public Street) · Greater Ost / South Union
- Southland Addition partial replat no 4Dec 3, 20260.50 ac · Unrestricted · Greater Ost / South Union
- Rhodes CornerNov 12, 20264 lots · 0.15 ac · Single Family Residential (Shared Driveways) · Greater Ost / South Union
- Grace Lane EstatesNov 12, 20263 lots · 0.23 ac · Single Family Residential (Public Street) · Greater Ost / South Union
- Mainer PlaceOct 29, 20262 lots · 0.11 ac · Single Family Residential (Public Street) · Greater Ost / South Union
- Eastwood Street VillasOct 15, 20262 lots · 0.18 ac · Single Family Residential (Public Street) · Greater Ost / South Union
- Grace Lane EstatesOct 15, 20263 lots · 0.23 ac · Single Family Residential (Public Street) · Greater Ost / South Union
Commercial construction in 77021
- 3850 Lydia St · Stephen SimonOct 23, 20261842 sq ft retail remodel
- 5229 Calhoun Rd · Macgregor Park - Tennis CntrOct 5, 2026Demolition bld/ sewer disc
- 3622 Old Spanish Trl · Fatany MansoorSep 14, 20261800 sq ft warehouse and office buildout
- 6420 Levit Green Blvd · Levit Green - Suite 100Sep 9, 202610,218 sq ft office/laboratory buildout - 100 % sp
- 7453 La Salette St · Skyline Home Builders LLCSep 9, 2026Utility sitework for (3) townhomes
- 2450 Holcombe Blvd · Tmc Innovation FactoryAug 14, 2026Demolition of interior non-load bearing non-fire rated walls