Crosby ISD Administration Building
Houston · 77532 · Harris County
Replat filed for Crosby ISD administration site
A 3.716-acre Class 2 subdivision replat is proposed for the Crosby ISD Administration Building site in Harris County. Application 2026-1419 was submitted on September 3, 2026; the filing lists church, school and institutional use, along with drainage or detention.
- Lots
- —
- Acres
- 3.72
- Next / last hearing
- Sep 3, 2026
- School district
- Crosby ISD
Application
Planning Commission history
- September 3, 2026Submitted
- September 3, 2026Submitted
- September 3, 2026Submitted
- September 3, 2026Listed
- September 3, 2026Submitted
- September 3, 2026Submitted
- September 3, 2026Submitted
- September 3, 2026Submitted
- September 3, 2026Submitted
- September 3, 2026Submitted
- September 3, 2026Submitted
- September 3, 2026Submitted
Questions about Crosby ISD Administration Building
What is happening at the Crosby ISD Administration Building site?
A Class 2 subdivision replat application was submitted for the 3.716-acre site. The application lists church, school and institutional use, along with drainage or detention.
Has the Crosby ISD site replat been approved?
The application is listed as Submitted, not approved. It was submitted on September 3, 2026.
How large is the Crosby ISD Administration Building replat?
The application covers 3.716 acres in Harris County.
What is application 2026-1419 for?
Application 2026-1419 is a Class 2 subdivision replat, or C2R, for the Crosby ISD Administration Building site.
What uses are listed for the Crosby ISD site?
The application lists church, school and institutional use, as well as drainage or detention.
Who is listed on the Crosby ISD replat application?
Auric Engineers is listed as the developer, and West Belt Surveying, Inc. is listed as the engineer or surveyor.
Other plats in 77532
- Indian Springs Sec 4 partial replat no 1Dec 3, 202619 lots · 2.69 ac · Single Family Residential (Public Street) · 77532
- Reserve at Crosby LynchburgDec 3, 20263.66 ac · Unrestricted · 77532
- Enclave at Newport partial replat no 1Nov 12, 20269 lots · 1.59 ac · Single Family Residential (Public Street) · 77532
- Newport PointeNov 12, 2026192.80 ac · Single Family Residential (Public Street) · 77532
- Huffman Fire Department Station 53Oct 29, 20262.98 ac · Unrestricted · 77532
- Sunflower AcresOct 15, 20262 lots · 6.38 ac · Single Family Residential (Public Street) · 77532
- Clarks AdditionOct 1, 20262 lots · 4.28 ac · Single Family Residential (Public Street) · 77532
- Preserve at Newport Detention ReserveSep 17, 202611.04 ac · Drainage or Detention · 77532
Commercial construction in 77532
- 11315 Sralla · 11318 Sralla ANov 13, 2026Sralla commercial — new construction — new pemb office warehouse building
- 14041 FM 2100 Rd · Chick-Fil-A Inc.Oct 29, 2026Cfa #4802 crosby — renovation/alteration — addition of a play area and relocation of the team member space in the dining room
- 5321 First St · Jckt Investments LLCOct 16, 2026Southern routes boutique — new construction — new construction of a 3230 sq ft metal building for a retail boutique
- 14703 FM 2100 · Crosby ISDOct 12, 2026Crosby isd athletic renovation — renovation/alteration — the project is located at 14703 fm 2100, crosby, texas 77532, and includes interior renovation of two, 1 story, existing pre-engineered metal buildings serving both the middle school and the high school in crosby isd
- 14035 FM 2100 Rd · Ms Crosby, LLCSep 24, 20267 brew coffee — new construction — pre-fabricated freestanding building with accompanying walk-in cooler, canopy, and trash enclosure. delivers beverages only through drive-through lanes. no interior or exterior dining component is provided; interior is only occupied by staff
- 706 Runneburg Rd · Crosby ISD - Robert HeniffJun 22, 2026Crosby isd admin building reno — renovation/alteration — the crosby administration building renovation is an existing building originally built in 3 phases dating back to 1957. the renovation will include architectural modifications, roof, hvac, electrical and technology modernization as well as site updat