Espinoza Plaza subdivision plat submitted in Harris County
A final plat for the 5.91-acre Espinoza Plaza subdivision was submitted in October 2026. The application, number 2026-1608, is for an unrestricted-use subdivision in ZIP code 77493; it does not specify what buildings or businesses may be developed there.
- Lots
- —
- Acres
- 5.91
- Next / last hearing
- Oct 29, 2026
- School district
- Katy ISD
Application
Planning Commission history
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Listed
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 15, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Listed
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
Questions about Espinoza Plaza
What is being built at Espinoza Plaza?
A final subdivision plat for a 5.91-acre site called Espinoza Plaza was submitted. The application does not identify specific buildings or businesses.
Where is Espinoza Plaza?
The subdivision application places Espinoza Plaza in Harris County, ZIP code 77493, in Katy ISD.
Has the Espinoza Plaza plat been approved?
The application status is Submitted, not approved. Planning Commission records list submissions on October 15 and October 29, 2026.
How large is the Espinoza Plaza subdivision?
The proposed plat covers 5.9067 acres. The application does not list a number of lots.
What does unrestricted land use mean for Espinoza Plaza?
The application lists the land use as unrestricted. It does not identify a specific project or tenant.
Who filed the Espinoza Plaza subdivision application?
Sahagan Architects is listed as the developer, and South Texas Surveying Associates, Inc. is listed as the engineer or surveyor. The application number is 2026-1608.
Other plats in 77493
- Shops at Ventana Lakes Replat No 1Dec 3, 20264.84 ac · Unrestricted · 77493
- OReilly SunterraDec 3, 20261.10 ac · Commercial · 77493
- Pelican Morton RanchNov 12, 202619.45 ac · Unrestricted Intended for Multifamily; Drainage or Detention; Lift Station · 77493
- Winward Falls Sec 1Oct 15, 2026270 lots · 145.50 ac · Drainage or Detention; Landscape or Open Space; Single Family Residential (Public Street); Other · 77493
- Katy Hockley CenterOct 15, 202610.21 ac · Commercial · 77493
- Katy Hockley DevelopmentOct 15, 20268.40 ac · Unrestricted · 77493
- Public Storage Katy Clay RoadOct 15, 20268.01 ac · Unrestricted; Landscape or Open Space · 77493
Commercial construction in 77493
- 24311 Morton Ranch Road · A-S 168 Morton-Porter LPNov 13, 2026Pelican morton ranch — new construction — 334 high-density style rental units with 7 base floor plans, 2 handicap type units with slight variations to accommodate elevation features
- 28046 Stockdick School Rd · Contfl, Inc.Nov 11, 2026Sunterra car wash — new construction — new construction of car wash facility, with pay station accessory building. facility includes, 125' tunnel with equpment room and vacuum station system
- 23910 FM 529 Rd · Porter RetailOct 30, 2026Porter retail — new construction — new 1-story, 12,370 sq ft retail building shell & associated sitework for future tenant build-out
- 23400 Colonial Parkway · Schlumberger Technology CorporationOct 13, 2026Schlumberger equipment relocation — renovation/alteration — renovation and relocation of equipment
- 24909 FM-529 · Pdc 9 Katy Lakes, LPSep 29, 2026Big blue swim school — renovation/alteration — interior build-out of a children's swim school in an existing tenant space. work includes carpentry, electrical, plumbing and hvac discipline
- 24613 FM 529 · Mini C LLCSep 28, 2026Katy lakes phase 2 — new construction — new construction phase 2