Reeveston Place replat proposed for 4.57 acres in 77039
A 4.5698-acre preliminary replat is proposed for Reeveston Place in ZIP code 77039. The Class 3 subdivision application, No. 2026-1732, is submitted; the fact sheet lists planning commission dates of October 29, November 12 and December 3, 2026. CE Engineers & Development Consultants, Inc. is listed as the developer, and the land use is unrestricted.
- Lots
- —
- Acres
- 4.57
- Next / last hearing
- Dec 3, 2026
- School district
- Aldine ISD
Application
Planning Commission history
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Listed
- October 29, 2026Submitted
- October 29, 2026Submitted
- October 29, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Listed
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- December 3, 2026Submitted
- December 3, 2026Submitted
- December 3, 2026Submitted
- December 3, 2026Submitted
Questions about Reeveston Place
What is proposed at Reeveston Place?
A Class 3 subdivision preliminary replat is proposed for 4.5698 acres. The application does not specify the number of lots.
Has the Reeveston Place replat been approved?
The application, No. 2026-1732, is listed as submitted. The fact sheet does not show an approval.
When is the Reeveston Place replat being considered?
The application lists planning commission dates of October 29, November 12 and December 3, 2026, each with submitted status.
Where is the Reeveston Place project?
The subdivision is in Harris County, ZIP code 77039. It is listed in Aldine ISD.
What is the proposed land use for Reeveston Place?
The application lists the land use as unrestricted. It does not identify a specific future use.
Who is the developer for the Reeveston Place replat?
CE Engineers & Development Consultants, Inc. is listed as the developer.
Other plats in 77039
- High Meadows Sec 2 partial replat no 1Dec 3, 20261 lots · 0.16 ac · Single Family Residential (Public Street) · 77039
- OReilly Magnolia GardensOct 29, 20261.63 ac · Commercial · 77039
- Aldine ISD Douglas MacArthur Highschool and Hambrick Middle School CampusesOct 1, 202665.56 ac · Church, School and Institutional · 77039
- Reyna IndustriesSep 3, 20264.63 ac · Church, School and Institutional; Commercial · 77039
- Aldine ISD Douglas MacArthur High School and Hambrick Middle School Campuses GPSep 3, 202673.99 ac · General Plan · 77039
- Domatex BuschongSep 3, 20263.69 ac · Commercial · 77039
- Magnolia OaksAug 20, 202612 lots · 2.04 ac · Drainage or Detention; Landscape or Open Space; Single Family Residential (PAE 1/PAE 2) · 77039
Commercial construction in 77039
- 5214 Aldine Mail Rd · North Wood Plaza Investors LLCNov 13, 2026Cajun craze — renovation/alteration — this is the existing vacant lease space, 4,472 sq ft, to be remodeled into a cajun restaurant
- 842 Buschong St · Dearborn Development, LLCOct 26, 2026Addition to alumanate - bce rents — additions to existing building — pemb addition to the alumate facility for a warehouse
- 13740 John F Kennedy Blvd · C-2 Kennedy Greens South LLCOct 9, 2026Kgdc v spec office build-out — new construction — spec office build-out for future tenant
- 1510 Superior Way · Nupi AmericasMay 7, 2026Nupi - addition phase 1 building b — new construction — new construction - pre fabricated building installation
- 1251 W Royal Lane · Piedmont Royal Lane LPMay 1, 2026Kirby ice house irving — new construction — bar with utility room area and beverage cooler, kitchen, indoor and outdoor seating areas, restrooms, storage, and office
- 13303 Aldine Westfield Rd · Aldine Westfield Mini StorageApr 30, 2026Aldine westfield mini storage — new construction — build new mini-storage facility with site work, concrete slab, metal structures, unit partitions, roll-up doors, paving, utilities, lighting, and required fire and life-safety elements