230.77-acre Liberty Twin Sisters North plat submitted
A preliminary plat application proposes Liberty Twin Sisters North, a 230.77-acre subdivision in Harris County, ZIP code 77447. The Class 3 application, number 2026-1807, was submitted on November 12, 2026; it does not specify buildings or a construction schedule.
- Lots
- —
- Acres
- 230.77
- Next / last hearing
- Dec 3, 2026
- School district
- —
Application
Planning Commission history
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Listed
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- November 12, 2026Submitted
- December 3, 2026Submitted
- December 3, 2026Submitted
- December 3, 2026Submitted
- December 3, 2026Submitted
Questions about Liberty Twin Sisters North
What is being built at Liberty Twin Sisters North?
A Class 3 preliminary plat application proposes a subdivision called Liberty Twin Sisters North. The submitted application does not specify what buildings or uses are planned.
Where is Liberty Twin Sisters North?
The proposed subdivision is in Harris County, ZIP code 77447. The fact sheet does not provide a street address.
How large is the Liberty Twin Sisters North subdivision?
The application lists the site as 230.77 acres.
Has Liberty Twin Sisters North been approved?
The application was listed as submitted, not approved. It was submitted on November 12, 2026, under application number 2026-1807.
Who is the developer of Liberty Twin Sisters North?
The application names Ward, Getz & Associates, LLC as the developer and Windrose as the engineer or surveyor.
What does unrestricted land use mean for Liberty Twin Sisters North?
The application lists the land use as unrestricted. It does not identify specific buildings or uses for the site.
Other plats in 77447
- Anchor Twin SistersDec 3, 20262273.00 ac · Unrestricted · 77447
- JDS Hopfe Road Botkins Street DedicationDec 3, 20264.76 ac · Street Dedication · 77447
- Dellrose Sec 21Dec 3, 2026123 lots · 30.50 ac · Commercial; Landscape or Open Space; Single Family Residential (Public Street) · 77447
- JDS Hopfe Road Mason Road Street Dedication Sec 1Dec 3, 20263.08 ac · Street Dedication · 77447
- JDS Hopfe Road Partial Replat No 1 Sec 5Dec 3, 20263 lots · 0.66 ac · Landscape or Open Space; Other · 77447
- Kickapoo Road Street DedicationDec 3, 202611.14 ac · Street Dedication · 77447
- Anchor Twin Sisters EastDec 3, 2026390.18 ac · Unrestricted · 77447
Commercial construction in 77447
- 19839 Hopfe Rd · Hopfe Project, LLCOct 26, 2026Hopfe rd. storage - bldgs. 2, 3, 4, 6, 7, 9, 10, & 12 — new construction — new construction of eight pre-engineered metal buildings for use as boat and rv self-storage. buildings 2 and 3 are 5,600 sq ft each; building 4 is 11,600 sq ft; buildings 6, 7, 9, and 10 are 10,400 sq ft each; and building 12 is a 10,080 sq ft metal canopy
- 26217 Betka Road · Kroger Texas L.p.Oct 22, 2026Kroger #189 — new construction — new ground up grocery store
- 13631 Dime Box Court · Bridgeland DevelopmentOct 8, 2026Bridgeland creekland village section 14, 17, 18 active adult ph 1b — new construction — concrete walks, mortar-in-place cobble, landscape boulders, grading, drainage, lighting & electrical, irrigation, and planting
- 17413 Jubilee Haven Blvd · Gc Hockley One LPSep 15, 2026Jubilee tract 2 shell retail building — new construction — the project is a new 17, 725 s.f multi tenant retail shell building. site work is permitted under separate set
- 17212 Becker Rd, Hockley, TX 77447 · Cumberland Ridge RetailSep 12, 2026Cumberland ridge retail — new construction — new construction shell building
- 19801 Hopfe Rd · Prudence Investments, LLCAug 18, 2026Hopfe rd. business park - building a, b, c and d — new construction — new construction of four pre-engineered metal shell buildings. building a,c and d are 5,000 sq ft each, and building b is 6,000 sq ft the interior of all four buildings will remain as shell for future build-out