groundranger
Historic · latest filing Jun 2024Commercial

10710 FM 1660 South

Hutto, TX 78634 · Secondary Clarifiers, Tertiary Filters + 4 more

Hutto South WWTP treatment upgrades registered in June 2024

New wastewater-treatment infrastructure is planned at the multi-tenant site at 10710 FM 1660 South, including secondary clarifiers, tertiary filters, pump station and flow-distribution equipment, and odor control. TDLR registrations for the six new-construction projects were filed on June 24, 2024; they include a 24,925-square-foot secondary clarifier project.

Summarized from Texas Department of Licensing and Regulation records · updated Jun 24, 2024

Projects
6
6 filings
Latest filing
Jun 24, 2024
since Jun 24, 2024
Largest scope
24,925 sf
Estimated cost
$3.8M
state registration

Where this project stands

In state plan review

Secondary Clarifiers

24,925 sq ft · $3.8M est.

  1. RegisteredJun 24, 2024
  2. Plan reviewnow
  3. ConstructionJul '24 – Sep '27
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 2 phone numbers

Permit & project history

6 projects
  1. Secondary clarifiers at hutto south wwtp are vital for improving effluent quality by removing solids, aiding in biological treatment, managing sludge, and maintaining process stability. — hutto south wwtp

    TDLR project registrationNew ConstructionProject Registered24,925 sq ft$3.8M est.
    Tenant / owner
    Secondary Clarifiers
    Design firm
    Pro
    Contact
    Pro
  2. Tertiary Filters

    Tertiary filters are crucial in wastewater treatment for removing fine particles, reducing pathogens, removing nutrients, polishing effluent, and ensuring compliance with environmental standards. — hutto south wwtp

    TDLR project registrationNew ConstructionProject Registered1,300 sq ft$2.3M est.
    Tenant / owner
    Tertiary Filters
    Design firm
    Pro
    Contact
    Pro
  3. The ras/was pump station is essential at wastewater treatment plants for recirculating activated sludge, removing waste sludge, controlling process flow, and optimizing treatment efficiency. — hutto south wwtp

    TDLR project registrationNew ConstructionProject Registered1,683 sq ft$1.6M est.
    Tenant / owner
    Ras Was Pump Station
    Design firm
    Pro
    Contact
    Pro
  4. The mixed liquor splitter box at south wwtp is necessary to evenly distribute mixed liquor flow among different treatment units, ensuring uniform treatment and maximizing efficiency in the wastewater treatment process. — hutto south wwtp

    TDLR project registrationNew ConstructionProject Registered713 sq ft$837K est.
    Tenant / owner
    Mixed Liquor Splitter Box
    Design firm
    Pro
    Contact
    Pro
  5. Installing an odor control system aims to reduce or neutralize odorous compounds produced during wastewater treatment. — hutto south wwtp

    TDLR project registrationNew ConstructionProject Registered3,720 sq ft$1.4M est.
    Tenant / owner
    Primary Treatment Odor Control
    Design firm
    Pro
    Contact
    Pro
  6. The primary clarifier splitter box at hutto south wwtp is needed to efficiently distribute incoming wastewater flow among multiple primary clarifiers. this helps in ensuring uniform loading and optimal performance of each clarifier. — hutto south wwtp

    TDLR project registrationNew ConstructionProject Registered995 sq ft$1.7M est.
    Tenant / owner
    Primary Clarifier Splitter Box
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 10710 FM 1660 South

What is being built at 10710 FM 1660 South in Hutto?

TDLR records list six new-construction projects for Hutto South WWTP, including secondary clarifiers, tertiary filters, a RAS/WAS pump station, splitter boxes, and primary-treatment odor control. The registrations were filed June 24, 2024.

Is Hutto South WWTP getting new secondary clarifiers?

Yes. The 24,925-square-foot secondary clarifier project was registered with TDLR on June 24, 2024, under project number TABS2024021549.

What wastewater treatment work is planned at the Hutto South WWTP?

Registrations include tertiary filters, a RAS/WAS pump station, mixed liquor and primary clarifier splitter boxes, and primary-treatment odor control. All six project registrations are dated June 24, 2024.

What is the tertiary filter project at 10710 FM 1660 South?

TDLR lists a 1,300-square-foot new-construction project for tertiary filters at Hutto South WWTP. It was registered June 24, 2024, as TABS2024021558.

When were the Hutto South WWTP projects registered?

All six TDLR project registrations are dated June 24, 2024. The records identify them as new construction.

Is the work at 10710 FM 1660 South a new wastewater treatment plant?

The registrations describe new components at Hutto South WWTP, including clarifiers, filters, a pump station, splitter boxes, and odor control. They do not describe construction of an entirely new plant.

Email me when plan review is complete