groundranger
Historic · latest filing Oct 2024Commercial

600 County Road 310

Iraan, TX 77354 · Big Sampson Wind LLC

Big Sampson Wind registered a 7,473-square-foot operations building

A 7,473-square-foot pre-engineered metal building for Big Sampson Wind is planned at 600 County Road 310, with office space and a shop for repairing wind farm equipment. The project was registered with TDLR on October 15, 2024 (TABS2025003202).

Summarized from Texas Department of Licensing and Regulation records · updated Oct 15, 2024

Projects
1
1 filings
Latest filing
Oct 15, 2024
since Oct 15, 2024
Largest scope
7,473 sf
Estimated cost
$2.6M
state registration

Where this project stands

Completed

Big Sampson Wind

7,473 sq ft · $2.6M est.

  1. RegisteredOct 15, 2024
  2. Plan review
  3. ConstructionNov '24 – May '25
  4. Inspected
  5. Closed

Ran as a 6-month build.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Big Sampson Wind

    Ground up construction of a pre-engineered metal building with 7,473 sq ft for group-b office space and group f-1 shop space for repair of wind farm equipment. — operations & maintenance building

    TDLR project registrationNew ConstructionProject Closed7,473 sq ft$2.6M est.
    Tenant / owner
    Big Sampson Wind
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 600 County Road 310

What is being built at 600 County Road 310 in Iraan?

The TDLR registration describes a 7,473-square-foot pre-engineered metal building with office space and a shop for wind farm equipment repair.

What will the building at 600 County Road 310 be used for?

It is described as an operations and maintenance building for Big Sampson Wind, with office space and a shop for repairing wind farm equipment.

When was the Big Sampson Wind project registered?

The project was registered with TDLR on October 15, 2024. Its registration number is TABS2025003202.

How large is the planned Big Sampson Wind building?

The TDLR registration lists 7,473 square feet.

How much is the Big Sampson Wind project estimated to cost?

The applicant's TDLR estimate for the project is $2,606,215.

Is the Big Sampson Wind project listed as closed?

Yes. The TDLR record lists the project status as “Project Closed.”

More offices in 77354, retail spaces in 77354.

Get alerts for 600 County Road 310