3041 Skyway Cir N
Irving, TX 75035 · Lba Rv Company I LP Dba Lba Realty
Drum storage and office renovation at 3041 Skyway Cir N
A 2,400-square-foot interior renovation of a drum storage area and an office area was registered on May 16, 2024, at 3041 Skyway Cir N in Irving. The TDLR record lists an estimated project cost of $150,000 and marks the project closed.
Summarized from Texas Department of Licensing and Regulation records · updated May 16, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 16, 2024
- since May 16, 2024
- Largest scope
- 2,400 sf
- Estimated cost
- $150K
- state registration
Where this project stands
CompletedSOW 2 - DRUM STORAGE
2,400 sq ft · $150K est.
- RegisteredMay 16, 2024
- Plan review
- ConstructionJun '24 – Oct '24
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectInterior renovation of a drum storage area and an office area. — mentor texas
TDLR project registrationRenovation/AlterationProject Closed2,400 sq ft$150K est.- Project #
- TABS2024018726
- Tenant / owner
- Sow 2 - Drum Storage
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3041 Skyway Cir N
What is being renovated at 3041 Skyway Cir N in Irving?
A TDLR project registration describes an interior renovation of a drum storage area and an office area. The 2,400-square-foot project was registered May 16, 2024, as TABS2024018726.
When was the drum storage renovation at 3041 Skyway Cir N permitted?
The TDLR record was filed May 16, 2024. It lists the project status as closed.
How much does the 3041 Skyway Cir N renovation cost?
The applicant’s estimated cost for the project is $150,000, according to the TDLR registration.
How large is the renovation at 3041 Skyway Cir N?
The TDLR registration lists 2,400 square feet for the interior renovation of a drum storage area and an office area.
What is being renovated near PPAI on Skyway Circle North?
At 3041 Skyway Cir N, about 272 meters from PPAI, a TDLR registration describes renovations to a drum storage area and an office area. The filing date is May 16, 2024.
Is a new building being constructed at 3041 Skyway Cir N?
The record describes an interior renovation, not new construction. It lists the project as a renovation or alteration and marks it closed.
Also being built nearby
All of 75035- 3041 Skyway Circle North · Johnson & Johnson MentorJun 12, 2024Johnson & johnson spray 8 — renovation/alteration — renovation of manufacturing area for the replacement of (e) spray 3 equipment for (n) spray 8 equipment
- 3041a Skyway Cir N 3041 Skyway Cir N · Lba Rv Company I LP Dba Lba RealtyApr 24, 2024Sow 1 - hazmat storage — new construction — new pre-engineered metal building for hazardous material storage and air compressor equipment
- 3041 Skyway Circle N · Lba Rv Company I LPSep 19, 2024West break room & restroom renovations — renovation/alteration — renovate existing break room & 3 sets of restrooms
- 3125 Skyway Cir NorthApr 19, 2024Ppai — renovation/alteration — interior remodel · 272 m away
- 3260 Skyway Circle N · 9091 Autobahn LLCJan 22, 2024Skyway office expansion — renovation/alteration — 2,957 sq ft expansion to an existing office space within an existing industrial warehouse buidling · 349 m away
- 2920 W Story RdJan 24, 2024Spantech — renovation/alteration — making showroom adding new flooring and new restroom and offices · 358 m away
- 3110 Skyway Circle S · Winfree Academy Charter SchoolDec 9, 202525111 - skyway industrial — new construction — demolition of existing site conditions. site rework and sloping. construction of new 66,900 sq ft building and site improvements · 469 m away
- 3130 Skyway Circle South · Sb Skyway Circle I, LLCOct 15, 20263130 skyway make ready — renovation/alteration — office demolition and refinish, demising walls, concrete, electrical, & hvac · 475 m away
- 3136 Skyway Circle South · Sb Skyway Circle I, LLCOct 27, 20263136 skyway circle make ready — renovation/alteration — ceiling demolition, flooring, lighting, paint, demising/layout and additional loading ramp · 478 m away
- 4850 N. Belt Line Rd · City Of IrvingJun 3, 2024Irving pd - indoor gun range — new construction — new construction for an indoor training gun range for irving pd · 561 m away
- 4850 N. Beltline Road · City Of IrvingOct 7, 2026Irving & grand prairie joint fire training center classroom & burn tower pavement repair — renovation/alteration — replace sidewalk, parking and drive pavement around the existing classroom and burn tower facilities and improve drainage to restore safe, accessible grades. approx. 8,100 sq ft of work area · 561 m away