1921 Hurd Er
Irving, TX 75038 · Abbott - Lc2
Abbott parking lot and roads set for concrete replacement
A TDLR project registration describes replacing asphalt in the parking lot and on roads at 1921 Hurd Er in Irving with new concrete. The project was registered on November 20, 2024, and is listed as closed. The applicant’s estimated project cost is $773,599.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 20, 2024
- since Nov 20, 2024
- Largest scope
- 33,369 sf
- Estimated cost
- $774K
- state registration
Where this project stands
CompletedAbbott - Parking Lot Project - LC2
33,369 sq ft · $774K est.
- RegisteredNov 20, 2024
- Plan review
- ConstructionOct '24 – Sep '25
- Inspected
- Closed
Ran as a 11-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRemove existing asphalt on 31,677 sq ft of parking lot and 33,369 sq ft of roads, excavate dirt and lime treat and pour new 6" concrete on parking lot and 8" concrete on roads and stripe as existing. — abbott - lc2
TDLR project registrationRenovation/AlterationProject Closed33,369 sq ft$774K est.- Project #
- TABS2025006050
- Tenant / owner
- Abbott - Parking Lot Project - Lc2
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1921 Hurd Er
What is being built at 1921 Hurd Er in Irving?
A parking lot and road renovation is registered for the site. The work includes removing asphalt and pouring new concrete.
What work is planned for the Abbott parking lot project?
The registration describes replacing asphalt on 31,677 square feet of parking lot and 33,369 square feet of roads. It also includes excavation, lime treatment, new concrete and striping.
When was the 1921 Hurd Er project filed?
The TDLR registration, TABS2025006050, is dated November 20, 2024.
How much will the Abbott parking lot project cost?
The applicant’s estimated cost for the project is $773,599.
Is the parking lot project at 1921 Hurd Er complete?
The TDLR record lists the project status as closed.
What is being renovated near Da-8 on Hurd Drive?
At 1921 Hurd Er, the TDLR registration describes replacing the parking lot and road surfaces with concrete. Da-8 is listed at 1915 Hurd Drive.
Also being built nearby
All of 75038- 1915 Hurd DrApr 19, 2024Abbott da-8 level 4 training center — renovation/alteration — renovate 45,000 sq ft existing space into new training center · 14 m away
- 1950 Hurd Dr · 1950 HurdMay 8, 2024Jbi bikes — renovation/alteration — second generation interior office remodel for new tenant finish out · 32 m away
- 1900 Hurd Road · Reserve Street Property, Co.Jul 19, 2024Hurd industrial park — new construction — development of one ~58k sq ft spec shell industrial building and associated site improvements. there is currently no spec office that is apart of this permit set and any interior improv. will be picked up with the tenant improvements later · 50 m away
- 1900 Hurd Dr · 1900 Hurd Partners LPMar 5, 202685c dallas support offices — renovation/alteration — add offices inside existing warehouse. partial change of occupancy from warehouse to office space · 50 m away
- 2000 Hurd Drive · 2000 HurdJun 20, 2025Dsi soutthwest interior improvements — renovation/alteration — existing building space remodel to demolition interior office walls & build new office area as shown. scope will also provide new accessible chair-lift and modified entrance · 107 m away
- 2525 Story Rd W · Oncor E DocMar 12, 2024Oncor e-doc remodel — renovation/alteration — removal of interior partition, addition of two interior offices to control room, rearrange work stations in storm room and replace ada lift with new to match existing · 489 m away