330 W Las Colinas, C2
Irving, TX 75039 · City Of Irving
Building C2 patio canopy and railing improvements
A 1,100-square-foot project at Building C2 calls for removing the existing exterior patio canopy and adding a new restaurant patio canopy and railings. The Texas Department of Licensing and Regulation registration was filed March 6, 2024; the applicant estimated the project cost at $500,000.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 6, 2024
- since Mar 6, 2024
- Largest scope
- 1,100 sf
- Estimated cost
- $500K
- state registration
Where this project stands
CompletedBuilding C2 Patio Improvements
1,100 sq ft · $500K est.
- RegisteredMar 6, 2024
- Plan review
- ConstructionMar '24 – Nov '24
- Inspected
- Closed
Ran as a 7-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectRemove existing exterior patio canopy. new restaurant patio canopy & railings. 1,100sf — toyota music factory
TDLR project registrationRenovation/AlterationProject Closed1,100 sq ft$500K est.- Project #
- TABS2024013185
- Tenant / owner
- Building C2 Patio Improvements
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 330 W Las Colinas, C2
What is being built at 330 W Las Colinas, C2?
The project calls for a new restaurant patio canopy and railings at Building C2, replacing an existing exterior patio canopy. The TDLR registration describes 1,100 square feet of work.
Is a restaurant opening at Building C2?
The TDLR record describes patio improvements for a restaurant, but it does not name the restaurant or confirm an opening.
What is planned near Toyota Music Factory?
A new restaurant patio canopy and railings are registered for Building C2 at 330 W Las Colinas, near Toyota Music Factory. The project registration was filed March 6, 2024.
When was the Building C2 patio project filed?
The TDLR project registration was filed March 6, 2024. Its project number is TABS2024013185.
How much will the Building C2 patio improvements cost?
The applicant estimated the project cost at $500,000. This is an estimate for the project, not a reported final cost.
Is the Building C2 patio project complete?
The TDLR record lists the project status as closed. That status alone does not confirm when construction was completed.
Also being built nearby
All of 75039- 320 W Las Colinas BlvdAug 12, 2024Tashan — renovation/alteration — interior finish out · 21 m away
- 320 Las Colinas Blvd · City Of IrvingAug 30, 2024Reseat of alamo drafthouse cinema — renovation/alteration — replacing existing theater rocker chairs with new powered recliners in each theater · 21 m away
- 340 W Las Colinas, C1-100 · City Of IrvingFeb 23, 2024Building c1, suite c1-100 tenant interior improvements — renovation/alteration — 3,824sf interior demolition, painting, flooring & drywall work for mama tried restaurant relocation to space c1-100 · 21 m away
- 340 W Las Colinas, Blvd · Toyota Music FactorySep 19, 2024Chino latino — renovation/alteration — interior remodeling · 21 m away
- 316 W. Las Colinas · City Of IrvingFeb 21, 2024Plaza improvements — new construction — provide new outdoor stage, shade seating, artificial turf, landscaping & exterior lighting · 29 m away
- 316 W Las Colinas Blvd · City Of IrvingSep 16, 2025Tmf security improvements — renovation/alteration — remove existing architectural bollards and replace in kind with crash rated bollards and objects throughout. 20,000 sq ft · 29 m away
- 310 W. Las Colinas Blvd · Brookfield PropertiesJun 24, 2024Drizzle cheesecakes — renovation/alteration — interior finish out · 62 m away
- 310 Las Colinas Blvd · City Of IrvingFeb 4, 2025Punch line comedy club at toyota music factory irving tx — renovation/alteration — interior refinish of existing space for punch line comedy club covering approximately 7,200 sq ft · 62 m away
- 370 W Las Colinas Blvd, Irving, Texas 75039 · City Of IrvingJun 1, 2026Roots chicken shak irving — renovation/alteration — renovate existing restaurant · 84 m away
- 315 West Las Colinas Boulevard 598 Promenade Parkway · City Of IrvingOct 30, 2024Lake carolyn phase v promenade — new construction — ramps, stairs, and promenade walkway with benches · 174 m away
- 4815 Fuller Court · David Weekley HomesMay 29, 2024Hillside at las colinas — new construction — new condo residential · 198 m away
- 240 W John Carpenter Fwy · Building 5Jul 24, 2026Samoa beauty aesthetics — renovation/alteration — salon build out build rooms to accommodate owners business needs. new hvac system, new electrical service. plumbing for hand sinks and restroom · 279 m away