6011 Connection Drive
Irving, TX 75039 · Las Colinas Connection @ 6011 Connection Drive
Second-floor office renovation planned at 6011 Connection Drive
A second-floor office renovation at 6011 Connection Drive is planned to add a training room, open work areas and private offices. The TDLR project registration, named for Gartner Irving, was filed on November 26, 2024, and lists 8,188 square feet; the project is marked closed.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 26, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 26, 2024
- since Nov 26, 2024
- Largest scope
- 8,188 sf
- Estimated cost
- $1.5M
- state registration
Where this project stands
CompletedGartner Irving - Bldg 6011 Level 2 Interior Renovation
8,188 sq ft · $1.5M est.
- RegisteredNov 26, 2024
- Plan review
- ConstructionDec '24 – May '25
- Inspected
- Closed
Ran as a 5-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior renovation to the tenants existing 2nd floor space. renovation includes selective demolition, renovation space to add large training room, open work areas, private offices. a horizontal exit is also being added. — las colinas connection @ 6011 connection drive
TDLR project registrationRenovation/AlterationProject Closed8,188 sq ft$1.5M est.- Project #
- TABS2025006388
- Tenant / owner
- Gartner Irving - Bldg 6011 Level 2 Interior Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6011 Connection Drive
What is being built at 6011 Connection Drive in Irving?
A TDLR registration describes an interior renovation of an existing second-floor tenant space, including a training room, open work areas, private offices and a horizontal exit. It was filed November 26, 2024, under project number TABS2025006388.
Is Gartner renovating space at 6011 Connection Drive?
The project registration is named “Gartner Irving - Bldg 6011 Level 2 Interior Renovation” and describes work in the tenant’s existing second-floor space. The registration was filed November 26, 2024.
How large is the 6011 Connection Drive renovation?
The TDLR registration lists the renovation area as 8,188 square feet.
What is the estimated cost of the 6011 Connection Drive project?
The TDLR registration lists an estimated project cost of $1.5 million. This is the applicant’s estimate, not a confirmed final cost.
Is a new building planned at 6011 Connection Drive?
The record describes an interior renovation to an existing second-floor tenant space, not a new building. The TDLR project is marked closed.
What is being renovated near Piedmont Operating Partnership at 6021 Connection Drive?
At 6011 Connection Drive, a TDLR registration describes a second-floor office renovation with a training room, open work areas and private offices. The listed landmark at 6021 Connection Drive is about 25 meters away.
Also being built nearby
All of 75039- 6021 Connection Dr · Piedmont Operating Partnership LPSep 25, 2026Fitness international — renovation/alteration — office remodel · 25 m away
- 6021 Connection Drive · Piedmont Operating Partnership, LPSep 8, 2026Publicis resources — renovation/alteration — interior renovation of select areas on each floor, includes mechanical, electrical and minor plumbing modifications · 25 m away
- 6021 Connection Dr. 7th · Piedmont Operating Partnership LPAug 6, 20267th floor common corridor — renovation/alteration — the scope of this project is a non-structural interior finish-out of a multi tenant corridor. scope includes mechanical and electrical · 25 m away
- 6021 Connection Drive · Piedmont Operating Partnership, LPJul 14, 2026Floor 1 and 2 common area improvements — renovation/alteration — interior renovation project in an existing commercial building · 25 m away
- 6031 Connection Drive · Piedmont Operating Partnership, LPMar 23, 2026Builders firstsource — renovation/alteration — non-structural interior finish out in an existing single floor suite · 50 m away
- 6031 Connection Dr. 3rd · Piedmont Operating Partnership LPJan 7, 20263rd floor common areas — renovation/alteration — renovation of common corridor and restrooms on a single floor. scope includes hvac, plumbing, and electrical · 50 m away
- 6031 Connection Dr · Piedmont Operating Partnership LPJan 7, 2026Check point — renovation/alteration — this is a non-structural, interior finish out of a single floor tenant. scope includes hvac, electrical, and plumbing · 50 m away
- 1251 W Royal Lane · Piedmont Royal Lane LPMay 1, 2026Kirby ice house irving — new construction — bar with utility room area and beverage cooler, kitchen, indoor and outdoor seating areas, restrooms, storage, and office · 267 m away
- 1101 W Royal Lane · Piedmont Royal Lane LPMar 30, 2026Morgan pearl landing — new construction — the project is a mixed-use and multi-family development constructed as multiple buildings. the project houses: 403 for-rent apartments with 11 live/work units. the project includes leasing/club/ fitness amenities, pool courtyard, dog park, dog w · 376 m away
- 1231 Greenway Drive · Taurus Cd203 Greenway Tower TX LPOct 7, 2024Rise48 equity — renovation/alteration — finish out existing suite · 478 m away
- 1231 Greenway Drive · Taurus Cd 203 Greenway Tower TX LPSep 30, 2024Lennar 5th floor — renovation/alteration — interior remodel for new office tenant · 478 m away
- 1320 Greenway Dr · Bridge Investments GroupJan 8, 2026Tower engineering renovation — renovation/alteration — tenant improvement · 509 m away