101 E Union Bower Rd
Irving, TX 75061 · Irving Independent School District
Cardwell career center cafeteria finishes to be renovated
A 2,775-square-foot renovation of the cafeteria finishes at Cardwell Career Preparatory Center was registered on March 12, 2025. The Texas Department of Licensing and Regulation record lists Irving Independent School District and an applicant-estimated project cost of $109,780. The record says the project is inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 12, 2025
- since Mar 12, 2025
- Largest scope
- 2,775 sf
- Estimated cost
- $110K
- state registration
Where this project stands
Inspected · closing outIISD Cardwell Multi-campus Renovations
2,775 sq ft · $110K est.
- RegisteredMar 12, 2025
- Plan review
- ConstructionJun '25 – Aug '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation of finishes at cafeteria — cardwell career preparatory center
TDLR project registrationRenovation/AlterationInspection Complete2,775 sq ft$110K est.- Project #
- TABS2025014014
- Tenant / owner
- Iisd Cardwell Multi-Campus Renovations
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 101 E Union Bower Rd
What is being renovated at 101 E Union Bower Road?
The project is a renovation of cafeteria finishes at Cardwell Career Preparatory Center. The TDLR project registration is TABS2025014014.
When was the Cardwell cafeteria renovation filed?
The TDLR registration was filed on March 12, 2025. It lists Irving Independent School District as the owner.
How large is the Cardwell cafeteria renovation?
The registered project covers 2,775 square feet.
How much is the Cardwell renovation estimated to cost?
The TDLR record lists an applicant-estimated cost of $109,780 for the project.
Is the Cardwell cafeteria renovation complete?
The TDLR record lists the project status as Inspection Complete.
What is being renovated near Irving ISD on O'Connor Road?
The Cardwell Career Preparatory Center cafeteria renovation is at 101 E Union Bower Road, about 313 meters from the Irving ISD location at 800 N. O'Connor Road.
Also being built nearby
All of 75061- 800 N. O'connor Road · Irving ISDApr 3, 2024Irving isd baby university — new construction — new construction of a daycare facility for irving isd · 313 m away
- 901 N Britain Rd · Irving Independent School DistrictMar 12, 2025Iisd pierce ecs multi-campus renovations — renovation/alteration — new shade structure and classroom casework replacment · 361 m away
- 900 N. O'connor Rd · Irving Independent School DistrictMay 22, 2025Irving high school-secure vestibules at various campuses — renovation/alteration — addition of secure vestibule into existing school entrance. demolition of existing reception into a lobby, new reception and a conference room · 370 m away
- 502 N O'connor Rd · Bassam Odeh Inc.Jan 20, 2026Jack in the box 00725 — additions to existing building — interior and exterior updates to finishes, new mechanical, electrical, and hvac systems, changes to the roof and parapet heights, relocated grease trap and dumpster encloser, and addition of a new walk-in cooler · 410 m away
- 610-612 N. Britain Rd · North Britain SuitedSep 9, 2026610-612 n. britain rd. — new construction — new construction - 2 suites and detached training office. total s.f. 6463 · 437 m away
- 411 N Britain RdApr 21, 2026411 n britain — new construction — new ground up 2830 sq ft retail space · 556 m away