331 Golden Triangle Boulevard
Keller, TX 76248 · Blue Sky Sports Ctr Keller LP
Toca Soccer Center Keller renovation and field reconfiguration
A renovation at Toca Soccer Center Keller includes reconfiguring indoor soccer fields, replacing the reception desk and modifying snack bar millwork. The project was registered with the Texas Department of Licensing and Regulation on April 19, 2024, under project number TABS2024016567. The registration lists 40,093 square feet and an applicant-estimated project cost of $450,000.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 19, 2024
- since Apr 19, 2024
- Largest scope
- 40,093 sf
- Estimated cost
- $450K
- state registration
Where this project stands
Inspected · closing outTOCA Soccer Center Keller
40,093 sq ft · $450K est.
- RegisteredApr 19, 2024
- Plan review
- ConstructionJun '24 – Aug '24
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReconfiguration of indoor soccer fields; demolition existing reception desk and construct new; modify millwork at snack bar — blue sky sports center
TDLR project registrationRenovation/AlterationInspection Complete40,093 sq ft$450K est.- Project #
- TABS2024016567
- Tenant / owner
- Toca Soccer Center Keller
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 331 Golden Triangle Boulevard
What is being built at 331 Golden Triangle Boulevard?
The TDLR registration describes renovation work at Toca Soccer Center Keller, including reconfiguring indoor soccer fields, replacing the reception desk and modifying snack bar millwork. The project was registered April 19, 2024, as TABS2024016567.
Is Toca Soccer Center Keller getting new indoor soccer fields?
The project description says the existing indoor soccer fields are being reconfigured. It does not describe them as new fields.
What work is planned for the reception desk and snack bar?
The registration describes demolishing the existing reception desk and constructing a new one, along with modifying millwork at the snack bar. It was filed with TDLR on April 19, 2024.
How much will the Toca Soccer Center Keller renovation cost?
The TDLR registration lists an applicant-estimated project cost of $450,000. It covers the project described under TABS2024016567.
What's being renovated near Walmart on Golden Triangle Boulevard?
Toca Soccer Center Keller, at 331 Golden Triangle Boulevard, has a registered renovation project for indoor field reconfiguration and reception desk and snack bar work. The registration was filed April 19, 2024.
Also being built nearby
All of 76248- 401 Golden Triangle Blvd · Me DevelopmentJun 16, 2025City futsal keller sports center — new construction — enclosed manufactured building with sports courts 64,700 sq ft open air pavillion with turf fields and concessions, 22,046 sq ft · 132 m away
- 5336 Golden Triangle Blvd · Wal-Mart Real Estate Business TrustFeb 12, 20262834-1021 fort worth tx - wb/bu/gate white box — renovation/alteration — white box, board up, and gate previous retail tenant · 217 m away
- 5336 Golden Triangle Boulevard · Walmart Stores Texas LLCJul 23, 2024Walmart 2834-5336 golden triangle blvd — additions to existing building — installing ev charging stations in existing commercial parking lot · 217 m away
- 4558 Keller Hicks Rd · Stems And Stones INCSep 7, 2026Storage building — new construction — building a garage / storage building for our landscaping trucks · 571 m away