2100 Memorial Blvd

Kerrville, TX 78028 · Baldwin Hall Bldg #3 - 4th Floor Finish-Out, Edington Gymnasium Expansion & Renovation

Baldwin Hall's 4th floor is getting an interior finish-out

A 16,133-square-foot interior finish-out is planned for the fourth floor of the existing Baldwin Hall dorm at Schreiner University. The project was registered with the Texas Department of Licensing and Regulation on March 11, 2026. The applicant estimates the project cost at $3.3 million.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 11, 2026

Projects
2
2 filings
Latest filing
Mar 11, 2026
since May 16, 2024
Largest scope
16,133 sf
Estimated cost
$5.5M
state registration

Where this project stands

Under construction

Baldwin Hall Bldg #3 - 4th Floor Finish-Out

16,133 sq ft · $3.3M est.

  1. RegisteredMar 11, 2026
  2. Plan review
  3. ConstructionMar '26 – Aug '27
  4. Inspected
  5. Closed
49% through of a 17-month buildMar 11, 2026 → Aug 11, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. Interior finish out of existing dorm — schreiner university - baldwin hall

    TDLR project registrationRenovation/AlterationReview Complete16,133 sq ft$3.3M est.
    Tenant / owner
    Baldwin Hall Bldg #3 - 4th Floor Finish-Out
    Design firm
    Pro
    Contact
    Pro
  2. Expansion of an existing gymnasium building that will add a large a new entrance, weight room, and offices. additionally the scope will include renovation of locker rooms, toilets, and support spaces - total area of work is 12,000sf — schreiner university edington gymnasium

    TDLR project registrationAdditions to Existing BuildingInspection Complete12,000 sq ft$5.5M est.
    Tenant / owner
    Edington Gymnasium Expansion & Renovation
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2100 Memorial Blvd

What is being built at 2100 Memorial Blvd in Kerrville?

A fourth-floor interior finish-out is planned for the existing Baldwin Hall dorm at Schreiner University. The TDLR project registration describes it as a renovation or alteration.

Is Baldwin Hall getting a new building?

The project description says it is an interior finish-out of an existing dorm, not a new building.

When was the Baldwin Hall finish-out filed?

The project was registered on March 11, 2026, with the Texas Department of Licensing and Regulation. Its registration number is TABS2026014730.

How large is the Baldwin Hall project?

The registered project area is 16,133 square feet.

How much will the Baldwin Hall project cost?

The applicant's estimated cost for the project is $3.3 million.

Where is the Baldwin Hall finish-out taking place?

The project is at 2100 Memorial Blvd, Kerrville, TX 78028, at Schreiner University.