groundranger
Recent · latest filing Jul 2025Commercial

309 Copperleaf Rd

Lakeway, TX 78734 · 309 Copperleaf Rd

309 Copperleaf Rd. renovation adds two bedrooms

A registered interior renovation at 309 Copperleaf Rd. adds two bedrooms at an assisted living center. The TDLR project registration was filed July 2, 2025, and describes bathroom accessibility changes and added fire-safety systems.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 2, 2025

Projects
1
1 filings
Latest filing
Jul 2, 2025
since Jul 2, 2025
Largest scope
3,013 sf
Estimated cost
$60K
state registration

Where this project stands

Completed

Assisted Living Center

3,013 sq ft · $60K est.

  1. RegisteredJul 2, 2025
  2. Plan review
  3. ConstructionAug '25 – Sep '25
  4. Inspected
  5. Closed

Ran as a 2-month build.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Interior renovation to add two bedrooms by converting the existing closet and divide the master bedroom. add ada shower and modify the existing toilet in the primary bathroom to meet ada requirements. add fire sprinkler, fire alarms and riser rm — 309 copperleaf rd

    TDLR project registrationRenovation/AlterationProject Closed3,013 sq ft$60K est.
    Tenant / owner
    Assisted Living Center
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 309 Copperleaf Rd

What is being built at 309 Copperleaf Rd. in Lakeway?

A registered interior renovation adds two bedrooms to an assisted living center by converting an existing closet and dividing the master bedroom. The project also includes bathroom accessibility changes and fire-safety systems.

When was the 309 Copperleaf Rd. renovation filed?

The TDLR project registration, TABS2025022593, was filed July 2, 2025.

Is a new assisted living center being built at 309 Copperleaf Rd.?

The registration describes an interior renovation at an assisted living center, not construction of a new center.

What accessibility work is planned at 309 Copperleaf Rd.?

The project description lists an ADA shower and modifications to the existing toilet in the primary bathroom to meet ADA requirements.

Are fire sprinklers being added at 309 Copperleaf Rd.?

Yes. The project description lists a fire sprinkler, fire alarms and a riser room.

How much is the 309 Copperleaf Rd. project estimated to cost?

The TDLR registration lists an applicant-estimated project cost of $60,000.

Is the 309 Copperleaf Rd. project still underway?

The TDLR registration lists the project status as closed.

Get alerts for 309 Copperleaf Rd