groundranger
Recent · latest filing Nov 2025Commercial

5002 US Highway 59

Laredo, TX 78041 · Tygat-I LLC

Stripes convenience store renovation at 5002 US 59

A 4,895-square-foot Stripes convenience store is being remodeled at 5002 US Highway 59 in Laredo. The TDLR project registration was filed November 25, 2025, and describes installing and relocating beverage, gondola and food-warming equipment, with plumbing and electrical modifications as needed. The applicant estimated the project cost at $87,600.

Summarized from Texas Department of Licensing and Regulation records · updated Nov 25, 2025

Projects
1
1 filings
Latest filing
Nov 25, 2025
since Nov 25, 2025
Largest scope
4,895 sf
Estimated cost
$88K
state registration

Where this project stands

Inspected · closing out

Stripes(40926)

4,895 sq ft · $88K est.

  1. RegisteredNov 25, 2025
  2. Plan review
  3. ConstructionJan '26 – Jan '27
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Stripes(40926)

    Stripes convenience store to be remodeled- installation and relocation of existing beverage equipment, gondolas, and food warming equipment - modifications to the existing plumbing and electrical systems as needed for the new and relocated equipment — stripes

    TDLR project registrationRenovation/AlterationInspection Complete4,895 sq ft$88K est.
    Tenant / owner
    Pro
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5002 US Highway 59

What is being built at 5002 US Highway 59 in Laredo?

TDLR records describe a remodel of the existing Stripes convenience store, including equipment installation and relocation and related plumbing and electrical modifications. The project registration was filed November 25, 2025.

Is a new Stripes opening at 5002 US Highway 59?

The TDLR record describes a remodel of an existing Stripes convenience store, not a new store. It was filed November 25, 2025.

What work is planned for the Stripes store in Laredo?

The registration lists installation and relocation of beverage equipment, gondolas and food-warming equipment, with plumbing and electrical changes as needed. The project covers 4,895 square feet.

When was the 5002 US Highway 59 project filed?

The TDLR project registration, TABS2026006691, was filed November 25, 2025.

How much will the Stripes remodel in Laredo cost?

The applicant estimated the project cost at $87,600, according to the TDLR registration. This is an estimate, not a confirmed final cost.

Is the Stripes renovation at 5002 US Highway 59 complete?

The TDLR record lists the project status as “Inspection Complete.”

More gas stations & car washes in 78041, restaurants in 78041, retail spaces in 78041.

Email me when the project is closed