groundranger
Historic · latest filing Mar 2025Commercial

1910 Bob Bullock Loop

Laredo, TX 78043 · Target #2112, Target Laredo TX T2112

Target in Laredo registered for interior finish repairs

An existing Target at 1910 Bob Bullock Loop is undergoing minor demolition and repair or replacement of finishes. The TDLR project registration was filed March 4, 2025, and says the work does not affect the building’s existing use, occupancy, life safety or egress.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 4, 2025

Projects
2
2 filings
Latest filing
Mar 4, 2025
since Mar 4, 2025
Largest scope
8,096 sf
Estimated cost
$3.8M
state registration

Where this project stands

Inspected · closing out

Target #2112

8,096 sq ft · $3.8M est.

  1. RegisteredMar 4, 2025
  2. Plan review
  3. ConstructionMar '25 – Sep '25
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 2 phone numbers

Permit & project history

2 projects
  1. Target #2112

    Existing target building with work limited to minor demolition and repair / replacement of finishes. existing occupancy, use, life safety and egress are not impacted by the completed works — laredo east

    TDLR project registrationRenovation/AlterationInspection Complete8,096 sq ft$3.8M est.
    Tenant / owner
    Target #2112
    Design firm
    Pro
    Contact
    Pro
  2. Interior remodel of office area, restrooms, sales floor, cafe and starbucks — target

    TDLR project registrationRenovation/AlterationProject Closed122,644 sq ft$3.5M est.
    Tenant / owner
    Target Laredo TX T2112
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1910 Bob Bullock Loop

What is happening at 1910 Bob Bullock Loop in Laredo?

An existing Target building is undergoing minor demolition and repair or replacement of finishes. The TDLR registration, filed March 4, 2025, is for project TABS2025013302.

Is a new Target being built at 1910 Bob Bullock Loop?

No new building is indicated in the registration. It describes renovation work in an existing Target building.

What work is planned at Target #2112 in Laredo?

The registered work is limited to minor demolition and repair or replacement of finishes. The record says existing use, occupancy, life safety and egress are not affected.

When was the Target renovation in Laredo filed?

The TDLR project registration was filed March 4, 2025. Its status is listed as Inspection Complete.

How much does the Target renovation at 1910 Bob Bullock Loop cost?

The TDLR registration lists an estimated project cost of $3,790,044. This is the applicant’s estimate, not a confirmed final cost.

What is being renovated near Plaza De San Isidro in Laredo?

The Target at 1910 Bob Bullock Loop is registered for minor demolition and repair or replacement of finishes. Plaza De San Isidro is listed about 418 meters away.

Also being built nearby

All of 78043

More demolitions in 78043.

Email me when the project is closed