groundranger
Recent · latest filing Sep 2025Commercial

216 Bob Bullock Loop

Laredo, TX 78043 · Steven Gutierrez Education Cener

Education center plans 1,800-square-foot conference room addition

A 1,800-square-foot addition with a conference room and two restrooms is planned at the education center at 216 Bob Bullock Loop. The project was registered with the Texas Department of Licensing and Regulation on September 12, 2025, under TABS2026000761; the registration lists wood-frame construction with a stucco finish.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 12, 2025

Projects
1
1 filings
Latest filing
Sep 12, 2025
since Sep 12, 2025
Largest scope
1,800 sf
Estimated cost
$210K
state registration

Where this project stands

Finishing up · inspection next

Education Center Expansion - Conference Room

1,800 sq ft · $210K est.

  1. RegisteredSep 12, 2025
  2. Plan review
  3. ConstructionOct '25 – Apr '26
  4. Inspectednow
  5. Closed

Scheduled to finish Apr 15, 2026; the state inspection hasn't been filed yet.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Added 1,800 sq ft, include conference room with 2 restrooms. wood frame and stucco finish — steven gutierrez education cener

    TDLR project registrationAdditions to Existing BuildingReview Complete1,800 sq ft$210K est.
    Tenant / owner
    Education Center Expansion - Conference Room
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 216 Bob Bullock Loop

What is being built at 216 Bob Bullock Loop in Laredo?

A 1,800-square-foot addition to an education center is registered for the address. The plans describe a conference room and two restrooms.

When was the education center expansion registered?

The project was registered on September 12, 2025, with the Texas Department of Licensing and Regulation. Its project number is TABS2026000761.

How large is the addition at 216 Bob Bullock Loop?

The TDLR registration lists 1,800 square feet of added space.

What will the education center addition include?

The registration describes a conference room and two restrooms, with wood-frame construction and a stucco finish.

How much is the education center expansion expected to cost?

The TDLR registration lists an estimated project cost of $210,000. This is the applicant's estimate, not a confirmed final cost.

What's being built near Whataburger on Highway 359?

A 1,800-square-foot education center addition is registered at 216 Bob Bullock Loop, about 364 meters from Whataburger at 4416 Highway 359.

What's being built near Albar on Ben-Cha Road?

An education center addition with a conference room and two restrooms is registered at 216 Bob Bullock Loop, about 292 meters from Albar at 4610 Ben-Cha Road.

Also being built nearby

All of 78043

More schools & daycares in 78043.

Email me when it passes inspection