8411 Bob Bullock Loop
Laredo, TX 78045 · Farias Development Ltd., A Texas Limited Partnership
Booster station building registered for 8411 Bob Bullock Loop
A one-story, 600-square-foot building for the Southeast Quadrant Booster Station was registered on December 6, 2024. The TDLR description specifies CMU construction, a sloped TPO roof and an overhead door. The applicant’s estimated project cost is $225,000.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 6, 2024
- since Dec 6, 2024
- Largest scope
- 600 sf
- Estimated cost
- $225K
- state registration
Where this project stands
Completed#23143.A - Southeast Quadrant Booster Station
600 sq ft · $225K est.
- RegisteredDec 6, 2024
- Plan review
- ConstructionJan '25 – May '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectOne-story, cmu construction building, cmu construction, sloped tpo roof system with overhead door. cad #822712 — southeast quadrant booster station
TDLR project registrationNew ConstructionProject Closed600 sq ft$225K est.- Project #
- TABS2025007087
- Tenant / owner
- #23143.a - Southeast Quadrant Booster Station
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 8411 Bob Bullock Loop
What is being built at 8411 Bob Bullock Loop?
A one-story building for the Southeast Quadrant Booster Station is listed in a TDLR project registration. The description specifies CMU construction, a sloped TPO roof and an overhead door.
When was the booster station project registered?
The TDLR registration was filed on December 6, 2024, under project number TABS2025007087.
How large is the new building at 8411 Bob Bullock Loop?
The TDLR record lists the building at 600 square feet.
What is the estimated cost of the booster station project?
The TDLR record lists an applicant estimate of $225,000 for the project.
What type of construction is planned for the booster station building?
The project description calls for CMU construction, a sloped TPO roof system and an overhead door.
Is the project listed as closed?
Yes. The TDLR record lists the project status as closed.