Historic · latest filing Feb 2025Commercial

1481 E. Hillpark Rd

Lewisville, TX 75056 · Build Replacement C Dock, Shm Pier 121 X1 Dock + 7 more

Floating boat docks and slips planned at Pier 121

TDLR registrations dated January 2024 through February 2025 describe new and replacement floating docks at this multi-tenant site. The projects include covered and open boat slips, with individual dock projects listing between 5 and 98 slips. The latest registration, filed February 24, 2025, is for a replacement dock with 18 covered 50-foot slips.

Summarized from Texas Department of Licensing and Regulation records · updated Feb 24, 2025

Projects
9
9 filings
Latest filing
Feb 24, 2025
since Jan 3, 2024
Largest scope
28,704 sf
Estimated cost
$4.7M
state registration

Where this project stands

Completed

Build Replacement C Dock

6,524 sq ft · $2.0M est.

  1. RegisteredFeb 24, 2025
  2. Plan review
  3. ConstructionMar '25 – Jun '25
  4. Inspected
  5. Closed

Ran as a 4-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

9 projects
  1. Build Replacement C Dock

    Build a floating boat dock with (18) 50' covered slips — shm pier 121

    TDLR project registrationNew ConstructionProject Closed6,524 sq ft$2.0M est.
    Tenant / owner
    Build Replacement C Dock
    Design firm
    Pro
    Contact
    Pro
  2. SHM Pier 121 X1 Dock

    Build a covered floating boat dock with (26) 40' slips — safe harbor pier 121

    TDLR project registrationNew ConstructionProject Closed7,900 sq ft$2.4M est.
    Tenant / owner
    Shm Pier 121 X1 Dock
    Design firm
    Pro
    Contact
    Pro
  3. Build a floating covered boat dock with (98) 50' boat slips — shm pier 121

    TDLR project registrationNew ConstructionProject Closed28,704 sq ft$4.7M est.
    Tenant / owner
    Shm Pier 121 I Dock Replacement
    Design firm
    Pro
    Contact
    Pro
  4. Build a new covered floating boat dock with (53) 60' boat slips — safe harbor pier 121

    TDLR project registrationNew ConstructionProject Closed24,700 sq ft$4.4M est.
    Tenant / owner
    Shm Pier 121 X Dock Build
    Design firm
    Pro
    Contact
    Pro
  5. Build a new covered floating boat dock with (14) 14' x 36' slips — safe harbor pier 121

    TDLR project registrationNew ConstructionProject Closed3,344 sq ft$600K est.
    Tenant / owner
    Shm Pier 121 B Dock Extension
    Design firm
    Pro
    Contact
    Pro
  6. Build a new floating dock with (5) 40' long open slips and (7) 30' long open slips. — safe harbor pier 121

    TDLR project registrationNew ConstructionProject Closed4,070 sq ft$600K est.
    Tenant / owner
    Shm Pier 121 Transient Dock Replacement
    Design firm
    Pro
    Contact
    Pro
  7. Build a new covered floating boat dock with (32) 50' slips; (27) 60' long slips and (5) 80' long slips — safe harbor pier 121

    TDLR project registrationNew ConstructionProject Closed19,912 sq ft$4.6M est.
    Tenant / owner
    Shm Pier 121 G Dock Replacement
    Design firm
    Pro
    Contact
    Pro
  8. Build a new covered floating dock, with (33) 50' long boat slips, (33) 60' long boat slips, (4) 80' long boat slips and (4) 30' long boat slips. dock will have shore power and a 3/4" hose bib connection at each slip — safe harbor pier 121

    TDLR project registrationNew ConstructionProject Closed24,400 sq ft$4.0M est.
    Tenant / owner
    Shm Pier 121 D Dock Replacement
    Design firm
    Pro
    Contact
    Pro
  9. Build a new covered floating dock, with (12) 18' wide by 50' long boat slips. — safe harbor pier 121

    TDLR project registrationNew ConstructionProject Closed4,840 sq ft$772K est.
    Tenant / owner
    Shm Pier 121 T Dock Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1481 E. Hillpark Rd

What is being built at 1481 E. Hillpark Road in Lewisville?

TDLR registrations describe new and replacement floating boat docks at the multi-tenant site, including covered and open slips. The filings span January 2024 to February 2025.

What’s being built next to Pier 121 in Lewisville?

The registrations at the Pier 121 address cover several floating dock projects. The latest, filed February 24, 2025, describes a replacement dock with 18 covered 50-foot slips.

How many boat slips are planned at 1481 E. Hillpark Road?

The nine TDLR project descriptions list slip counts for individual docks, ranging from 5 to 98. They include both covered slips and open slips.

Are the new docks at Pier 121 covered?

Most of the registered projects describe covered floating docks. One project, the transient dock replacement filed January 12, 2024, describes 12 open slips.

When were dock projects filed for Pier 121 in Lewisville?

The TDLR registrations in the records run from January 3, 2024, through February 24, 2025. The latest is the replacement C Dock project, registration TABS2025012611.

What is the latest dock project at 1481 E. Hillpark Road?

The latest listed project is Build Replacement C Dock, registered February 24, 2025, as TABS2025012611. Its description calls for a floating dock with 18 covered 50-foot slips.

Are the Pier 121 dock projects completed?

The TDLR records list all nine projects with a status of Project Closed. The records do not provide a separate construction completion date.