1980 Lakepoint Drive
Lewisville, TX 75057 · Waters Ridge
Waters Ridge Building C planned for 50,630-square-foot office finish-out
A 50,630-square-foot spec office finish-out is planned inside the existing shell of Building C at 1980 Lakepoint Drive in Lewisville. The TDLR project registration was filed August 12, 2025, and describes the work as a first-time finish-out within the shell building. The applicant's estimated project cost is $188,800.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 12, 2025
- since Aug 12, 2025
- Largest scope
- 50,630 sf
- Estimated cost
- $189K
- state registration
Where this project stands
Finishing up · inspection next335.003 - Bldg C Spec Office
50,630 sq ft · $189K est.
- RegisteredAug 12, 2025
- Plan review
- ConstructionSep '25 – Nov '25
- Inspectednow
- Closed
Scheduled to finish Nov 24, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectFirst time finish out within shell building — waters ridge
TDLR project registrationNew ConstructionReview Complete50,630 sq ft$189K est.- Project #
- TABS2025025648
- Tenant / owner
- 335.003 - Bldg C Spec Office
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1980 Lakepoint Drive
What is being built at 1980 Lakepoint Drive in Lewisville?
A 50,630-square-foot spec office finish-out is planned inside the existing shell of Building C. The TDLR registration, filed August 12, 2025, is listed as TABS2025025648.
Is a new office building being built at 1980 Lakepoint Drive?
The registration describes a first-time finish-out within an existing shell building, not construction of a new building. It lists the project as new construction and gives the area as 50,630 square feet.
When was the Waters Ridge Building C office project filed?
The TDLR project registration was filed August 12, 2025. Its status is listed as Review Complete.
How much will the office project at 1980 Lakepoint Drive cost?
The applicant's estimated cost for the project is $188,800. This is an estimate in the TDLR registration, not a reported final project cost.
What's being built near Waters Ridge at 1940 Lakepoint Drive?
The project at 1980 Lakepoint Drive is a planned 50,630-square-foot spec office finish-out inside Building C's existing shell. Its TDLR registration was filed August 12, 2025.
What's being built near Joe's Crab Shack on South Stemmons Freeway?
At 1980 Lakepoint Drive, about 320 meters from Joe's Crab Shack, a 50,630-square-foot spec office finish-out is registered for Building C. The TDLR filing date is August 12, 2025.
Also being built nearby
All of 75057- 1960 Lakepoint Dr · Lmj Family Holdings LPMar 7, 2025343-mwc — new construction — first time finish out within existing shell building · 43 m away
- 1940 Lakepoint Drive · Waters RidgeAug 12, 2025335.002 - building a spec office — new construction — first time finish out within shell building · 85 m away
- 1955 Lakeway Dr · Denton County Transportation AuthorityMay 30, 2025Lakeway drive expansion — renovation/alteration — suite 265 will undergo mild renovations, including two wall poke-throughs to connect with suite 260 and demolition of select interior walls to create more collaborative space · 182 m away
- 2066 S Stemmons Fwy · Joe's Crab ShackMar 28, 2025Remodel/addition — additions to existing building — remodeling existing 7573 square feet. and adding 5404 square feet to bulding · 320 m away
- 1825 Lakeway Drive · Waters Ridge II & Iii, LLCJul 24, 2026Ford expansion — renovation/alteration — renovation/ alteration · 518 m away
- 1800 Lakeway DriveAug 13, 2024Responsive education solutions-fca e lewisville & lewisville school of science & tech project ph2 — renovation/alteration — approximately 1000 sq ft of renovation work · 583 m away
More offices in 75057.