952 Lakeside Cir
Lewisville, TX 75057 · City Of Lewisville
Lewisville DCTA Trail Connection-Segment A
A new shared-use trail connection is planned at 952 Lakeside Cir in Lewisville. The City of Lewisville’s project was registered with TDLR on May 19, 2025, for about 1.02 miles of trail improvements, with a path typically 12 feet wide. The applicant estimated the project cost at $1,012,200.
Summarized from Texas Department of Licensing and Regulation records · updated May 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 19, 2025
- since May 19, 2025
- Largest scope
- 64,665 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
Finishing up · inspection nextLewisville DCTA Trail Connection-Segment A
64,665 sq ft · $1.0M est.
- RegisteredMay 19, 2025
- Plan review
- ConstructionAug '25 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 1, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe project includes a hard surface, shared use path that is typically 12 feet wide. approximately 1.02 miles of trail improvements. approximate square footage is 64,665 sq ft — dcta trail segment a
TDLR project registrationNew ConstructionReview Complete64,665 sq ft$1.0M est.- Project #
- TABS2025019272
- Tenant / owner
- Lewisville Dcta Trail Connection-Segment A
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 952 Lakeside Cir
What is being built at 952 Lakeside Cir in Lewisville?
A TDLR registration describes the Lewisville DCTA Trail Connection-Segment A, a shared-use path with about 1.02 miles of trail improvements. The project was registered on May 19, 2025.
When was the Lewisville DCTA trail project permitted?
The project was registered with the Texas Department of Licensing and Regulation on May 19, 2025. Its TDLR number is TABS2025019272.
How long is the new trail connection in Lewisville?
The project description says it includes approximately 1.02 miles of trail improvements. The path is typically 12 feet wide.
How much will the Lewisville DCTA Trail Connection cost?
The applicant estimated the project cost at $1,012,200 in its TDLR registration. This is an estimate, not a confirmed final cost.
Who is responsible for the trail project at 952 Lakeside Cir?
The record lists the City of Lewisville as the project owner. The registered project name is Lewisville DCTA Trail Connection-Segment A.
What is being built near Bdgoyal at 870 Hebron Pkwy?
A TDLR registration describes a shared-use trail connection with approximately 1.02 miles of improvements at 952 Lakeside Cir, about 535 meters from Bdgoyal. The registration was filed on May 19, 2025.