851 Highway 121
Lewisville, TX 75067 · Costco #683 Lewisville - Fuel Facility Generator Addition, Costco Lewisville, TX - Gas Expansion + 1 more
Generator addition planned at Costco fuel facility in Lewisville
A new generator, concrete pad, bollards and chain-link fence enclosure are planned at the existing Costco #683 fuel facility at 851 Highway 121. The project was registered with TDLR on September 25, 2026; the registration describes electrical work and pavement and landscape repairs, with no building work.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 25, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Sep 25, 2026
- since Jun 17, 2024
- Largest scope
- 13,400 sf
- Estimated cost
- $4.0M
- state registration
Where this project stands
In state plan reviewCostco #683 Lewisville - Fuel Facility Generator Addition
7,290 sq ft · $165K est.
- RegisteredSep 25, 2026
- Plan reviewnow
- ConstructionJan '27 – Jan '27
- Inspected
- Closed
Construction is scheduled to start Jan 1, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
5 projectsNew generator on a new concrete pad with bollards and a new chain link fence enclosure at the existing fuel facility. includes electrical work and an electrical trench with pavement and landscape repair. no building work. — costco wholesale #683 fuel facility
TDLR project registrationRenovation/AlterationProject Registered7,290 sq ft$165K est.- Project #
- TABS2027002037
- Tenant / owner
- Costco #683 Lewisville - Fuel Facility Generator Addition
- Design firm
- Pro
- Contact
- Pro
696 sq ft : the construction consists of the removal of existing/installation of new and relocated refrigerated display cases. — costco wholesale
TDLR project registrationRenovation/AlterationInspection Complete696 sq ft$180K est.- Project #
- TABS2025015602
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
(6) mpd l-shaped fuel expansion, remove and replace concrete & tank slabs, install 40k gallon ust. re-configure entry and exit drive aisle with parking lot modification. convert existing premium tank to unleaded. full re-pipe to existing dispensers. — costco wholesale - lewisville, tx
TDLR project registrationAdditions to Existing BuildingProject Closed13,400 sq ft$4.0M est.- Project #
- TABS2024022079
- Tenant / owner
- Costco Lewisville, TX - Gas Expansion
- Design firm
- Pro
- Contact
- Pro
The scope of work includes the removal and replacement of equipment, fixtures, and finishes in the member, tire center and receiving area restrooms and janitor's closet. — costco wholesale
TDLR project registrationRenovation/AlterationProject Closed980 sq ft$280K est.- Project #
- TABS2024021011
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
The construction consists of the replacement of the existing pizza oven and hood as well as interior finish renovations of a 1,133 sq ft food court. the scope of work includes but is not limited to mechanical, plumbing, and electrical/lighting systems. — costco wholesale
TDLR project registrationRenovation/AlterationProject Closed1,133 sq ft$360K est.- Project #
- TABS2023021660
- Tenant / owner
- Costco #683 Lewisville, TX Food Court Refresh
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 851 Highway 121
What is being built at 851 Highway 121 in Lewisville?
A generator is planned for the existing Costco #683 fuel facility, along with a concrete pad, bollards and a chain-link fence enclosure. The TDLR project registration is TABS2027002037.
Is a new Costco being built in Lewisville?
The registration describes an addition to the existing Costco #683 fuel facility, not a new Costco. It also specifies that there is no building work.
When was the Costco fuel facility generator project registered?
The project was registered with the Texas Department of Licensing and Regulation on September 25, 2026.
How much is the Costco generator project estimated to cost?
The applicant’s TDLR estimate for the project is $165,000.
What work is included in the Costco fuel facility project?
The registration lists a new generator, concrete pad, bollards and chain-link fence enclosure, plus electrical work and an electrical trench. Pavement and landscaping will be repaired.
What is being built near Total Point Urgent Care on Highway 121?
At the nearby Costco #683 fuel facility, a generator addition is planned. TDLR registered the project on September 25, 2026.
Is the Costco fuel facility project next to QuikTrip on Highway 121?
The project is at 851 Highway 121, about 178 meters from the listed QuikTrip #928 site at 801 E SH 121 Bus. It involves a generator addition at Costco’s existing fuel facility.
Also being built nearby
All of 75067- 855 State Highway 121 · 855 Texas 121 LLCFeb 3, 2026Total point urgent care — renovation/alteration — remodel of an existing building into an urgent care doctor office, 3762 sq ft · 14 m away
- 801 E SH 121 Bus · Qt South, LLCJan 21, 2026Quiktrip # 928 fryer project — renovation/alteration — includes re-organization of existing kitchen equipment and addition of new fryer units. project 300 sq ft · 178 m away
- 785 State Highway 121 · Apple Hospitality ReitJun 13, 2025Hilton garden inn lewisville, tx renovation — renovation/alteration — market refresh, bar expansion & guestroom bath renovations (select rooms) · 270 m away
- 701 E. Main Street · Ojala Partners, LPJul 31, 2024The standard at old town — new construction — 1-story detached clubhouse for a multifamily apartments, townhomes and cottage buildings · 440 m away
- 1221 And E Main Street · Terra Devco LLCApr 3, 2025Autozone #10550 — new construction — new 7009 sq ft autozone retail store · 440 m away
More gas stations & car washes in 75067, parking structures in 75067.