groundranger
Historic · latest filing Sep 2024Commercial

200 E Grayson St

Live Oak, TX 78215 · Alamo Community College District

Building 700 Salado Hall gets moisture-barrier and drainage work

Renovation work at Building 700 Salado Hall includes a new moisture barrier, brick repairs, door adjustments and site drainage improvements. The 64,000-square-foot project was registered with TDLR on September 6, 2024, and its status is listed as inspection complete. The applicant estimated the project cost at $4 million.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 6, 2024

Projects
1
1 filings
Latest filing
Sep 6, 2024
since Sep 6, 2024
Largest scope
64,000 sf
Estimated cost
$4.0M
state registration

Where this project stands

Inspected · closing out

NLC Moisture Barrier Improvements to Building 700 Salado Hall (Academic I) Stormwater Improvements

64,000 sq ft · $4.0M est.

  1. RegisteredSep 6, 2024
  2. Plan review
  3. ConstructionNov '24 – Aug '25
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 1 phone number

Permit & project history

1 project
  1. This project includes a new moisture barrier, brick repairs, control joints, door adjustments, and patchwork, along with site drainage improvements like curb and gutter, larger inlets, grading modifications, and a french drain. 64,000 sq ft — northwest lakeview college

    TDLR project registrationRenovation/AlterationInspection Complete64,000 sq ft$4.0M est.
    Tenant / owner
    Nlc Moisture Barrier Improvements To Building 700 Salado Hall (academic I) Stormwater Improvements
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 200 E Grayson St

What is being renovated at 200 E Grayson St?

The project covers Building 700 Salado Hall (Academic I), with moisture-barrier and brick repairs, door adjustments, patchwork and drainage improvements. It was registered with TDLR on September 6, 2024.

What drainage work is planned at Building 700 Salado Hall?

The registered scope includes curb and gutter, larger inlets, grading modifications and a French drain. The project status is listed as inspection complete.

How much will the Salado Hall renovation cost?

The TDLR registration lists an applicant-estimated cost of $4 million for the project.

How large is the Building 700 Salado Hall project?

The TDLR registration describes a 64,000-square-foot renovation and stormwater improvement project.

What's being renovated near Oxbow Real Estate at 111 Isleta?

At 200 E Grayson St, the project is moisture-barrier, building repair and drainage work at Building 700 Salado Hall. It was registered with TDLR on September 6, 2024.

Also being built nearby

All of 78215
Email me when the project is closed