groundranger
Recent · latest filing Jul 2026Commercial

602 Indiana Avenue

Lubbock, TX 79415 · Umc Mcinturff Renovation, Umc West Equipment Room Upgrades + 11 more

UMC renovations and equipment upgrades at 602 Indiana Avenue

Four renovation projects are registered at this multi-tenant site, with TDLR filings dated February 28 through July 9, 2026. The scopes include renovating 9,000 square feet of conference space and replacing electrical distribution equipment in multiple locations.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 9, 2026

Projects
13
13 filings
Latest filing
Jul 9, 2026
since Feb 28, 2024
Largest scope
13,844 sf
Estimated cost
$98M
state registration

Where this project stands

Under construction

UMC McInturff Renovation

9,000 sq ft · $1.9M est.

  1. RegisteredJul 9, 2026
  2. Plan review
  3. ConstructionSep '26 – Sep '27
  4. Inspected
  5. Closed
22% through of a 12-month buildSep 1, 2026 → Sep 1, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

13 projects
  1. Project scope of work includes renovation of 9,000 sq ft of existing conference space and associated toilet rooms — university medical center (umc)

    TDLR project registrationRenovation/AlterationReview Complete9,000 sq ft$1.9M est.
    Tenant / owner
    Umc Mcinturff Renovation
    Design firm
    Pro
    Contact
    Pro
  2. Replacement of existing electrical distribution equipment in multiple locations — university medical center

    TDLR project registrationRenovation/AlterationReview Complete2,125 sq ft$850K est.
    Tenant / owner
    Umc West Equipment Room Upgrades
    Design firm
    Pro
    Contact
    Pro
  3. Replacement of existing electrical distribution equipment in multiple locations — university medical center

    TDLR project registrationRenovation/AlterationReview Complete1,050 sq ft$615K est.
    Tenant / owner
    Umc East Equipment Room Upgrades
    Design firm
    Pro
    Contact
    Pro
  4. UMC MRI Room 2 Renovation

    An approximate 700 sq ft renovation of the existing rfi room 2 space for an equipment upgrade. construction includes mechanical, electrical, plumbing infrastructure upgrades as well as selected finish upgrades — lubbock county hospital district dba umc

    TDLR project registrationRenovation/AlterationInspection Complete700 sq ft$685K est.
    Tenant / owner
    Umc Mri Room 2 Renovation
    Design firm
    Pro
    Contact
    Pro
  5. Project scope of work includes the renovation of the nicu on the first floor of the east tower north end (13,844sf) — university medical center

    TDLR project registrationRenovation/AlterationReview Complete13,844 sq ft$1.0M est.
    Tenant / owner
    Umc Nicu Renovations
    Design firm
    Pro
    Contact
    Pro
  6. Project scope of work includes the renovation of the cv/cicu on the 6th floor of the main hospital (7,625sf) — university medical center

    TDLR project registrationRenovation/AlterationReview Complete7,625 sq ft$2.1M est.
    Tenant / owner
    Umc Cv/Cicu Renovation
    Design firm
    Pro
    Contact
    Pro
  7. 8,641 sq ft renovation of 20 on-call rooms including ancillary support spaces located on the basement level of the main hospital — university medical center

    TDLR project registrationRenovation/AlterationReview Complete8,641 sq ft$1.5M est.
    Tenant / owner
    Umc On-Call Room Renovations
    Design firm
    Pro
    Contact
    Pro
  8. This project consists of renovation work, equipment and finish upgrades of the existing or (680 sq ft) & central pharmacies (4,800 sq ft) including relocated offices (1,300 sq ft). — university medical center

    TDLR project registrationRenovation/AlterationReview Complete6,780 sq ft$1.3M est.
    Tenant / owner
    Umc Basement Pharmacy Renovation & Office Relocation
    Design firm
    Pro
    Contact
    Pro
  9. UMC Pedi Playground

    Project consists of a pediatric playground for in-patient use only and includes colorful pathways, seating and children's activity equipment. estimated sq ft: 1,972sf — university medical center

    TDLR project registrationRenovation/AlterationProject Closed1,972 sq ft$476K est.
    Tenant / owner
    Umc Pedi Playground
    Design firm
    Pro
    Contact
    Pro
  10. Reno of spaces totaling approx 800 sq ft within the main hospital 6th floor cath lab #4, control room, and equipment room to support equipment replacement — university medical center

    TDLR project registrationRenovation/AlterationProject Closed800 sq ft$435K est.
    Tenant / owner
    Umc Imaging Room Mod Ph 3 - Cath Lab Rm #4 Reno
    Design firm
    Pro
    Contact
    Pro
  11. UMC Lubbock Cancer Center

    Addition of a new cancer center to the umc campus will be 3 stories to include radiation oncology & infusion, outpatient clinics including a pediatric care, 2 pharmacies, intagrative medicine treatment, lab, admin & support spaces 122,888sf — umc lubbock cancer center

    TDLR project registrationAdditions to Existing BuildingProject Closed122,888 sq ft$98M est.
    Tenant / owner
    Umc Lubbock Cancer Center
    Design firm
    Pro
    Contact
    Pro
  12. Renovation of isolation rooms on 1st, 4th, 5th, and 6th floors of the main hospital — university medical center

    TDLR project registrationRenovation/AlterationProject Closed4,927 sq ft$1.0M est.
    Tenant / owner
    Umc Multi-Floor Isolation Room Upgrades
    Design firm
    Pro
    Contact
    Pro
  13. Reno of spaces within the main hospital 6th floor cath labs #1 & #2, control room, and equipment rooms to support equipment replacement — university medical center

    TDLR project registrationRenovation/AlterationProject Closed1,579 sq ft$1.1M est.
    Tenant / owner
    Umc Imaging Rm Mods Ph 2b-Cath Lab Rms 1&2 Reno 6th Fl
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 602 Indiana Avenue

What is being built at 602 Indiana Avenue?

TDLR records list renovations and equipment upgrades at the multi-tenant site, rather than a new building. The projects include conference-space, electrical equipment-room, and MRI-room work.

What is changing in the UMC McInturff Renovation?

The project covers renovation of 9,000 square feet of existing conference space and associated toilet rooms. It was registered on July 9, 2026, under TDLR number TABS2026024870.

Are electrical equipment rooms being upgraded at 602 Indiana Avenue?

Yes. Two TDLR registrations dated May 18, 2026, describe replacement of existing electrical distribution equipment in multiple locations. They are listed as the UMC West and UMC East Equipment Room Upgrades.

What work is planned for the UMC MRI room?

The UMC MRI Room 2 registration describes an approximately 700-square-foot renovation for an equipment upgrade, including mechanical, electrical, plumbing, and selected finish work. It was filed February 28, 2026, as TABS2026013805.

Is UMC renovating the entire property at 602 Indiana Avenue?

The records describe specific renovation and equipment-upgrade scopes at a multi-tenant site; they do not say the entire property is being renovated. The four registrations span February 28 to July 9, 2026.

What's happening next to UMC EP Lab 2 Equipment Update?

The map data places that project at 602 Indiana Avenue, where TDLR records also list conference-space, electrical equipment-room, and MRI-room renovations. A separate EP Lab 2 filing describes a 1,030-square-foot renovation for an equipment upgrade.

Also being built nearby

All of 79415

More warehouses & industrial in 79415, medical facilities in 79415, offices in 79415.

Email me when it passes inspection