13201 Bois D'arc

Manor, TX 78653 · 13400 Highway 290 Agv, LLC

Four-building self-storage facility planned in Manor

A new self-storage facility with four single-story buildings is planned at 13201 Bois D'arc in Manor. The TDLR project registration, dated September 4, 2024, describes 102,890 square feet of climate-controlled and non-climate-controlled units. The applicant's estimated project cost is $7.5 million.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 4, 2024

Projects
1
1 filings
Latest filing
Sep 4, 2024
since Sep 4, 2024
Largest scope
102,890 sf
Estimated cost
$7.5M
state registration

Where this project stands

Inspected · closing out

Presidential Self Storage, Phase I

102,890 sq ft · $7.5M est.

  1. RegisteredSep 4, 2024
  2. Plan review
  3. ConstructionDec '24 – May '26
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. New self-storage facility with four (4) single-story buildings totaling 102,890 square feet, with both climate- and non climate-controlled units. — presidential self storage

    TDLR project registrationNew ConstructionInspection Complete102,890 sq ft$7.5M est.
    Tenant / owner
    Presidential Self Storage, Phase I
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 13201 Bois D'arc

What is being built at 13201 Bois D'arc in Manor?

The TDLR registration describes a new self-storage facility called Presidential Self Storage, Phase I, with four single-story buildings.

How large is Presidential Self Storage, Phase I?

The registered project totals 102,890 square feet.

Will the storage units be climate controlled?

The project description says the facility will include both climate-controlled and non-climate-controlled units.

When was the Manor self-storage project registered?

The TDLR project registration is dated September 4, 2024. Its project number is TABS2025000159.

How much will the self-storage facility cost?

The applicant's estimated cost for the project is $7.5 million.

Is Presidential Self Storage, Phase I complete?

The TDLR record lists the project's status as Inspection Complete.