groundranger
Recent · latest filing Apr 2026Commercial

1101 N Holland Road

Mansfield, TX 76063 · Southside Bank

Southside Bank planned at 1101 N Holland Road

A new 1,521-square-foot Southside Bank with a two-lane drive-through is planned at 1101 N Holland Road in Mansfield. The project was registered with the Texas Department of Licensing and Regulation on April 13, 2026; the registration describes wood-frame construction.

Summarized from Texas Department of Licensing and Regulation records · updated Apr 13, 2026

Projects
1
1 filings
Latest filing
Apr 13, 2026
since Apr 13, 2026
Largest scope
1,521 sf
Estimated cost
$1.0M
state registration

Where this project stands

In state plan review

Southside Bank Mansfield

1,521 sq ft · $1.0M est.

  1. RegisteredApr 13, 2026
  2. Plan reviewnow
  3. ConstructionJun '26 – Jan '27
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. New ground up bank with two lane drive through, wood frame construction. — southside bank mansfield

    TDLR project registrationNew ConstructionProject Registered1,521 sq ft$1.0M est.
    Tenant / owner
    Southside Bank Mansfield
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1101 N Holland Road

What is being built at 1101 N Holland Road in Mansfield?

A new Southside Bank with a two-lane drive-through is planned for the address. The TDLR project registration describes a 1,521-square-foot, wood-frame building.

Is a new bank planned for 1101 N Holland Road?

Yes. A TDLR registration dated April 13, 2026, lists a new Southside Bank project at the address.

Will the Southside Bank have a drive-through?

The project description specifies a two-lane drive-through.

How big is the planned Southside Bank in Mansfield?

The TDLR registration lists the building at 1,521 square feet.

What is the estimated cost of the Southside Bank project?

The applicant's TDLR estimate for the project is $1 million. This is an estimate, not a confirmed final cost.

What is the TDLR project number for the Mansfield Southside Bank?

The project registration number is TABS2026017502. It was registered on April 13, 2026.

Email me when plan review is complete