groundranger
Recent · latest filing Mar 2026Commercial

3201 W. Pecan Blvd

McAllen, TX 78501 · Pecan Campus Student Sevices Building K Cashier's Renovation, Business And Science Bldg. G Engineering Lab Renovation

Renovations registered for two Pecan Campus buildings

Renovations are registered for two buildings at this multi-tenant site: a cashier’s suite and call center in Student Services Building K, and engineering labs in Business and Science Building G. TDLR registrations were filed Feb. 5 and March 13, 2026.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 13, 2026

Projects
2
2 filings
Latest filing
Mar 13, 2026
since Feb 5, 2026
Largest scope
6,285 sf
Estimated cost
$1.9M
state registration

Where this project stands

Finishing up · inspection next

Pecan Campus Student Sevices Building K Cashier's Renovation

6,285 sq ft · $1.9M est.

  1. RegisteredMar 13, 2026
  2. Plan review
  3. ConstructionMar '26 – Aug '26
  4. Inspectednow
  5. Closed

Scheduled to finish Aug 24, 2026; the state inspection hasn't been filed yet.

4 contacts on this project · 3 phone numbers

Permit & project history

2 projects
  1. 6,285 sq ft finish-out of existing cashier's suite and call center. including demolition of finishes, demising partitions, and doors down to shell conditions. replace with all new construction and suite layout — student sevices building k

    TDLR project registrationRenovation/AlterationReview Complete6,285 sq ft$1.9M est.
    Tenant / owner
    Pecan Campus Student Sevices Building K Cashier's Renovation
    Design firm
    Pro
    Contact
    Pro
  2. Alteration of 3 previous classrooms/labs 3,418 sq ft being converted into 3 purpose specific labs and storage space into an existing multi-level building. — stc pecan campus

    TDLR project registrationRenovation/AlterationReview Complete3,418 sq ft$400K est.
    Tenant / owner
    Business And Science Bldg. G Engineering Lab Renovation
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 3201 W. Pecan Blvd

What is being built at 3201 W. Pecan Blvd?

TDLR registrations describe renovations in two existing campus buildings: a cashier’s suite and call center in Building K, and engineering labs in Building G. The registrations were filed Feb. 5 and March 13, 2026.

Is a new building being constructed at 3201 W. Pecan Blvd?

The registrations describe renovations to existing buildings, not a new building. One project is a 6,285-square-foot finish-out in Student Services Building K; the other converts former classrooms and labs in Building G.

What is changing in Student Services Building K?

The registered project calls for a 6,285-square-foot finish-out of the existing cashier’s suite and call center. TDLR registration TABS2026014958 was filed March 13, 2026.

What is being renovated in Business and Science Building G?

The project converts three former classrooms and labs, totaling 3,418 square feet, into three purpose-specific labs and storage space. TDLR registration TABS2026011810 was filed Feb. 5, 2026.

When were the Pecan Campus renovation projects registered?

The Building G engineering lab renovation was registered with TDLR on Feb. 5, 2026. The Building K cashier’s renovation was registered on March 13, 2026.

Also being built nearby

All of 78501

More demolitions in 78501, warehouses & industrial in 78501.

Email me when it passes inspection