301-B E Louisiana St
McKinney, TX 75069 · Bresnan Bread And Pastery
Bresnan Bread and Pastry finish-out in downtown McKinney
A 1,800-square-foot interior finish-out for Bresnan Bread and Pastry is listed at 301-B E Louisiana St in McKinney. The Texas Department of Licensing and Regulation recorded the project on April 28, 2025, with an applicant-estimated cost of $100,000; its status is listed as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 28, 2025
- since Apr 28, 2025
- Largest scope
- 1,800 sf
- Estimated cost
- $100K
- state registration
Where this project stands
CompletedBRESNAN BREAD AND PASTRY
1,800 sq ft · $100K est.
- RegisteredApr 28, 2025
- Plan review
- ConstructionJul '25 – Dec '25
- Inspected
- Closed
Ran as a 6-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectFinish out — bresnan bread and pastery
TDLR project registrationRenovation/AlterationProject Closed1,800 sq ft$100K est.- Project #
- TABS2025017684
- Tenant / owner
- Bresnan Bread And Pastry
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 301-B E Louisiana St
What is being built at 301-B E Louisiana St?
TDLR records describe a 1,800-square-foot finish-out for Bresnan Bread and Pastry. The project is listed as a renovation or alteration.
When was the Bresnan Bread and Pastry project registered?
The TDLR registration is dated April 28, 2025. Its project number is TABS2025017684.
How much is the Bresnan Bread and Pastry project estimated to cost?
The applicant's estimated cost for the project is $100,000, according to its TDLR registration.
Is the finish-out at 301-B E Louisiana St complete?
The TDLR record lists the project status as closed. The record does not say when the work was completed.
What is being built near Hope Hardware Building in McKinney?
A 1,800-square-foot finish-out for Bresnan Bread and Pastry is listed at 301-B E Louisiana St, about 137 meters from the Hope Hardware Building, according to the supplied records.
Is this a new building or a renovation?
The project is categorized as a renovation or alteration, and its description says finish-out. The registration does not describe a new building.
Also being built nearby
All of 75069- 101 S Chestnut St · Ben Kuehne Holdings 2 LLC & Alycia Kuehne Holdings 2 LLCDec 26, 2025The cipher lounge — renovation/alteration — interior remodel · 13 m away
- 103 S Chestnut St · Ben Kuehne Holdings 2 LLCOct 20, 2025The chestnut hall — renovation/alteration — build out · 19 m away
- 103 South Chestnut Street · Ben Kuehne Holdings 2 LLC & Alycia Kuehne Holdings 2 LLCSep 12, 2025Kbi, llc - elevator addition — renovation/alteration — add new elevator, lobby, and exterior door for second floor. separate from balance of first floor with 1-hr tenant separation to bottom of second composite floor deck · 19 m away
- 131 S. Chestnut Street · City Of MckinneyDec 15, 2025Mckinney water meter building — renovation/alteration — add a small 625 sq ft room for testing water meters · 92 m away
- 224 E Virginia Street · Sp1 220 E Virginia LLCJul 10, 2026Lusso pasta market — renovation/alteration — 2,112 sq ft interior finish out of one story existing building in historic downtown mckinney. minimal work (primarily finishes) in existing cafe · 94 m away
- 225 East Virginia St · Rg Mckinney LLCJun 5, 2026Project square mckinney — additions to existing building — renovation of existing 16,095 sq ft building, construction of a 13,181 addition and associated interior build-out of professional office · 106 m away
- 214 East Louisiana Street Na · Hope Hardware BuildingMay 3, 2024Naminohana restaurant — renovation/alteration — restore historic building restaurant · 137 m away
- 111 N. Tennessee St · City Of MckinneyNov 12, 2025Courthouse theater exterior restoration & interior renovation — renovation/alteration — scope includes building improvements to the exterior and interior of the historic former collin county courthouse in order to improve functionality as a performance venue · 160 m away
- 112 S. Tennessee St · C4tx Holdings LLCMay 23, 2026112 s. tennessee st. renovation — renovation/alteration — replace sewage line. build out restroom and small office in back of building, front will be for retail space · 162 m away
- 121 S Tennessee Street · Baptist Church Loan Corporation C/O The Parks ChurchSep 15, 2026Alterations to the commons — renovation/alteration — very limited interior alteration of the existing 6,149-square-foot church facility known as “the commons,” including leveling floor in one area, adding two new partitions, opening an existing wall in two places, and adding a new porch, steps, & ramp · 169 m away
- 121-129-131 S Tennessee St · The Parks ChurchMar 24, 2024New building for the parks church — new construction — 2 story new church · 173 m away
- 112 East Louisiana Street · S Five Partners LPAug 29, 2024Centro kitchen and bar — renovation/alteration — new renovation and finish-out construction in an existing 5,423 square feet, restaurant lease space · 183 m away