6928 Mediterranean Drive
McKinney, TX 75070 · Grs Capital, LLC
Brooks-Rogers Office planned as a 9,076-square-foot building
A new 9,076-square-foot, two-story wood-framed office building with an elevator is planned at 6928 Mediterranean Drive in McKinney. The Texas Department of Licensing and Regulation registered the project on June 5, 2024, under project number TABS2024020118. The applicant estimated the project cost at $1.8 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 5, 2024
- since Jun 5, 2024
- Largest scope
- 9,076 sf
- Estimated cost
- $1.8M
- state registration
Where this project stands
In state plan reviewBrooks-Rogers Office
9,076 sq ft · $1.8M est.
- RegisteredJun 5, 2024
- Plan reviewnow
- ConstructionJul '24 – Jun '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectNew construction of a 9,076 square feet, wood-framed 2-story building with elevator. — brooks-rogers office
TDLR project registrationNew ConstructionProject Registered9,076 sq ft$1.8M est.- Project #
- TABS2024020118
- Tenant / owner
- Brooks-Rogers Office
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6928 Mediterranean Drive
What is being built at 6928 Mediterranean Drive in McKinney?
The project registration describes a new two-story office building with an elevator, named Brooks-Rogers Office. It is planned to contain 9,076 square feet.
When was the Brooks-Rogers Office project registered?
The Texas Department of Licensing and Regulation registration is dated June 5, 2024. The project number is TABS2024020118.
How large is the office building planned for 6928 Mediterranean Drive?
The registered project is for a 9,076-square-foot, two-story building.
What is the estimated cost of the Brooks-Rogers Office project?
The applicant's estimated project cost is $1.8 million, according to the TDLR registration dated June 5, 2024.
What is being built near Summit Construction Partners on Mediterranean Drive?
At 6928 Mediterranean Drive, the TDLR registration describes a new 9,076-square-foot Brooks-Rogers Office building. Summit Construction Partners is listed at nearby 6924 Mediterranean.
What is being built next to Building D at 6932 Mediterranean Drive?
The registered project at 6928 Mediterranean Drive is a new two-story office building named Brooks-Rogers Office. Building D is listed at nearby 6932 Mediterranean Drive.
Also being built nearby
All of 75070- 6924 Mediterranean · Summit Construction Partners LLCApr 24, 2026Cantrell building b — new construction — new construction of a 2-story office building · 2 m away
- 6932 Mediterranean Drive · Building DJan 24, 2025Cantrell office — new construction — new construction of a 1-story office building · 2 m away
- 375 Adriatic Parkway · Draper And Kramer, Inc.Oct 11, 2024Bell tower reserve renovations — renovation/alteration — renovations to an existing 4-story building containing 121 residential units over a 1-story below grade parking structure. work to include updates to the common areas · 248 m away
- 6900 Virginia Pkwy · Pnc Bank N.aAug 30, 2024Pnc tx stonebridge mckinney interior refresh — renovation/alteration — interior alteration of approximately 3456 sq ft updating floor and wall finishes, millwork, furniture, and electrical/data modifications to accomodate new furniture and millwork · 337 m away
- 6700 Virginia Parkway · Barclay/Texas Holdings IINov 19, 2025Zarminali health — renovation/alteration — the work includes: the limited demolition of interior non-load bearing partition walls; the construction of new interior non-load bearing partition walls; the construction and installation of new interior finishes including lay-in ceilings and led li · 443 m away
More offices in 75070.