2800 E. U.s. Hwy. 80
Mesquite, TX 75149 · Cavalry Real Estate Partners, LLC
203,488-square-foot industrial building planned in Mesquite
A 203,488-square-foot shell industrial building, called Mesquite 80 Logistics Center, is planned at 2800 E. U.S. Hwy. 80 in Mesquite. Its TDLR project registration was filed January 16, 2025, and includes site work such as grading, utilities and paving. The applicant’s estimated project cost is $12.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 16, 2025
- since Jan 16, 2025
- Largest scope
- 203,488 sf
- Estimated cost
- $13M
- state registration
Where this project stands
CompletedMesquite 80 Logistics Center
203,488 sq ft · $13M est.
- RegisteredJan 16, 2025
- Plan review
- ConstructionFeb '25 – Dec '25
- Inspected
- Closed
Ran as a 10-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 project203,000 sq ft shell industrial building, incl. site work (mass grading, excavation, utilities, paving, landscaping & irrigation). — mesquite 80 logistics center
TDLR project registrationNew ConstructionProject Closed203,488 sq ft$13M est.- Project #
- TABS2025009759
- Tenant / owner
- Mesquite 80 Logistics Center
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2800 E. U.s. Hwy. 80
What is being built at 2800 E. U.S. Hwy. 80 in Mesquite?
A 203,488-square-foot shell industrial building called Mesquite 80 Logistics Center is planned for the address. The TDLR registration also describes site work.
When was the Mesquite 80 Logistics Center registered?
The TDLR project registration was filed January 16, 2025. It is listed as project TABS2025009759.
How large is the Mesquite 80 Logistics Center?
The registered project is 203,488 square feet and is described as a shell industrial building.
What is the estimated cost of the Mesquite 80 Logistics Center?
The TDLR registration lists an estimated project cost of $12.5 million. This is the applicant’s estimate.
What site work is planned at 2800 E. U.S. Hwy. 80?
The registration includes mass grading, excavation, utilities, paving, landscaping and irrigation, along with construction of the shell industrial building.