2150 Towne Centre Dr
Mesquite, TX 75150 · City Of Mesquite
Mesquite Heritage Trail Phase 2 adds a hike-and-bike trail
The City of Mesquite registered new construction for Mesquite Heritage Trail Phase 2 on September 10, 2025. The project description includes paving, drainage, a bridge and a retaining wall. The applicant’s estimated project cost is $6,845,385.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 10, 2025
- since Sep 10, 2025
- Largest scope
- 6,647 sf
- Estimated cost
- $6.8M
- state registration
Where this project stands
CompletedMesquite Heritage Trail Phase 2
6,647 sq ft · $6.8M est.
- RegisteredSep 10, 2025
- Plan review
- ConstructionJun '24 – Sep '25
- Inspected
- Closed
Ran as a 16-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectNew construction of hike and bike trail. (paving 6647 sy, drainage, bridge, & retaining wall) — mesquite heritage trail phase 2
TDLR project registrationNew ConstructionProject Closed6,647 sq ft$6.8M est.- Project #
- TABS2026000610
- Tenant / owner
- Mesquite Heritage Trail Phase 2
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2150 Towne Centre Dr
What is being built at 2150 Towne Centre Dr in Mesquite?
A new hike-and-bike trail, listed as Mesquite Heritage Trail Phase 2, is planned. The TDLR project registration was filed September 10, 2025.
What does Mesquite Heritage Trail Phase 2 include?
The project description lists paving, drainage, a bridge and a retaining wall. It describes 6,647 square yards of paving.
How much will Mesquite Heritage Trail Phase 2 cost?
The applicant’s estimated cost for the project is $6,845,385, according to the TDLR registration filed September 10, 2025.
Is the Mesquite Heritage Trail Phase 2 project complete?
The TDLR record lists the project status as “Project Closed.” That status alone does not confirm whether construction is complete.
What is being built near Safe And Bound in Mesquite?
Mesquite Heritage Trail Phase 2 is registered for 2150 Towne Centre Dr, about 207 meters from Safe And Bound at 2670 Gus Thomasson Rd. The project description lists a hike-and-bike trail with paving, drainage, a bridge and a retaining wall.
When was Mesquite Heritage Trail Phase 2 registered?
The TDLR project registration, number TABS2026000610, is dated September 10, 2025.
Also being built nearby
All of 75150- 2670 Gus Thomasson Rd · Safe And Bound Inc.Aug 21, 2026Frontier direct care - mesquite — renovation/alteration — tenant finish out · 207 m away
- 19105 Lyndon B Johnson Freeway · T Mesquite Mkt Wst TX LLC Et AlDec 30, 2025Burlington mesquite, tx — renovation/alteration — interior renovation of a 23,705 s.f. retail space. new floor fixtures, restrooms, offices, stock, receiving and sales. all new painted finishes, plumbing fixtures, light fixtures and minor roof repair · 426 m away
- 18995 Lbj Freeway · Sendero Mesquite Lh, LPFeb 1, 2024Longhorn steakhouse mesquite — new construction — new construction of a full service restaurant · 427 m away
- 19121 Lyndon B. Johnson Fwy · T Mesquite Mkt Pads Tx, LLCMar 7, 2024America's best-mesquite — renovation/alteration — 3242 s.f. demolition of previous tenant's layout including non-bearing partitions, doors, ceiling grid and finishes. new partitions, doors & frames, ceiling grid, lighting, hvac distribution, plumbing fixtures, finishes, furniture and equipment · 430 m away