2150 Towne Centre Dr

Mesquite, TX 75150 · City Of Mesquite

Mesquite Heritage Trail Phase 2 adds a hike-and-bike trail

The City of Mesquite registered new construction for Mesquite Heritage Trail Phase 2 on September 10, 2025. The project description includes paving, drainage, a bridge and a retaining wall. The applicant’s estimated project cost is $6,845,385.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 10, 2025

Projects
1
1 filings
Latest filing
Sep 10, 2025
since Sep 10, 2025
Largest scope
6,647 sf
Estimated cost
$6.8M
state registration

Where this project stands

Completed

Mesquite Heritage Trail Phase 2

6,647 sq ft · $6.8M est.

  1. RegisteredSep 10, 2025
  2. Plan review
  3. ConstructionJun '24 – Sep '25
  4. Inspected
  5. Closed

Ran as a 16-month build.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. New construction of hike and bike trail. (paving 6647 sy, drainage, bridge, & retaining wall) — mesquite heritage trail phase 2

    TDLR project registrationNew ConstructionProject Closed6,647 sq ft$6.8M est.
    Tenant / owner
    Mesquite Heritage Trail Phase 2
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2150 Towne Centre Dr

What is being built at 2150 Towne Centre Dr in Mesquite?

A new hike-and-bike trail, listed as Mesquite Heritage Trail Phase 2, is planned. The TDLR project registration was filed September 10, 2025.

What does Mesquite Heritage Trail Phase 2 include?

The project description lists paving, drainage, a bridge and a retaining wall. It describes 6,647 square yards of paving.

How much will Mesquite Heritage Trail Phase 2 cost?

The applicant’s estimated cost for the project is $6,845,385, according to the TDLR registration filed September 10, 2025.

Is the Mesquite Heritage Trail Phase 2 project complete?

The TDLR record lists the project status as “Project Closed.” That status alone does not confirm whether construction is complete.

What is being built near Safe And Bound in Mesquite?

Mesquite Heritage Trail Phase 2 is registered for 2150 Towne Centre Dr, about 207 meters from Safe And Bound at 2670 Gus Thomasson Rd. The project description lists a hike-and-bike trail with paving, drainage, a bridge and a retaining wall.

When was Mesquite Heritage Trail Phase 2 registered?

The TDLR project registration, number TABS2026000610, is dated September 10, 2025.