4789 Highway 30
Mesquite, TX 75150 · Ema / Cma Properties
Fire-damaged DFW Truck and Auto Accessories building to be remodeled
A TDLR project registration filed November 4, 2024, describes a remodel of the fire-damaged building at 4789 Highway 30, with part of the structure already demolished and removed. The plans include a small rear expansion; the 13,000-square-foot project has an applicant-estimated cost of $1.4 million.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 4, 2024
- since Nov 4, 2024
- Largest scope
- 13,000 sf
- Estimated cost
- $1.4M
- state registration
Where this project stands
In state plan reviewDFW Truck and Auto Accessories
13,000 sq ft · $1.4M est.
- RegisteredNov 4, 2024
- Plan reviewnow
- ConstructionDec '24 – Aug '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectA fire damaged a large portion of this building. a portion of the building has been demolition'd and removed. there is a small expansion on the rear of the building. the entire building will be remodeled. — dfw truck and auto accessories mesquite
TDLR project registrationAdditions to Existing BuildingProject Registered13,000 sq ft$1.4M est.- Project #
- TABS2025004764
- Tenant / owner
- Dfw Truck And Auto Accessories
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4789 Highway 30
What is being built at 4789 Highway 30 in Mesquite?
A TDLR registration describes a full remodel of the fire-damaged building, plus a small expansion at the rear. It says part of the building was demolished and removed.
Is DFW Truck and Auto Accessories remodeling its Mesquite building?
A project registration filed November 4, 2024, names DFW Truck and Auto Accessories and describes remodeling the entire building after fire damage.
When was the project at 4789 Highway 30 registered?
The TDLR project registration, TABS2025004764, was filed November 4, 2024.
How large is the remodel at 4789 Highway 30?
The registered project is listed as 13,000 square feet.
How much will the 4789 Highway 30 project cost?
The applicant's estimated cost for the project is $1.4 million.
Was part of the building at 4789 Highway 30 demolished?
The project description says a portion of the fire-damaged building was demolished and removed. It also describes a small rear expansion and a remodel of the entire building.
Also being built nearby
All of 75150- 2359 Great Light DrNov 25, 2020Install water heater · 472 m away
- 2347 Great Light DrSep 17, 2026Run ductwork, one supply and one return to a bedroom · 479 m away
- 3323 Shining Light DrJul 14, 2026Dig up sewer line and make spot repair on 3 foot section of the sewer line. in the front of the home where roots have penetrated · 485 m away
- 2339 Great Light DrSep 11, 2020Replace or modify existing hvac · 489 m away
- 3319 Shining Light DrApr 13, 2026Re-roof with tamko class 3 impact resistant roof color is rustic black · 491 m away
- 3222 Guiding Light DrNov 5, 2025Plumbing remodel. will need inspector to come out and inspect shower pan and rough in in the wall · 508 m away
- 2357 Light Shore DrOct 23, 20262357 light shore install 13 concrete pilings to stabilize foundation · 564 m away
- 2329 Light Shore DrMay 21, 2026Hvac replacement · 596 m away
More demolitions in 75150.