What's being built in Austin 78705
341 Austin addresses in 78705 had a building permit or project filing in the past 12 months, out of 618 on record. The most active project types are demolitions (74), restaurants (53), offices (40). The latest filing here was November 13, 2026.
- Active in last 12 mo
- 341
- Addresses on record
- 618
- Latest filing
- Nov 13, 2026
By project type
Recent commercial projects
- 501 24th StNov 18, 2026The arconia
- 2008 San Antonio StNov 18, 20262008 san antonio street
- 408 23rd StNov 17, 2026Villas 23sa
- 701 W 24th StNov 17, 2026First time tenant fit out for a restaurant
- 1201 W 38th StNov 16, 2026This project consists of renovation on the ground floor of the existing ascension seton main campus hospital to expand and modernize the existing sterile processing department. alterations will also extend into areas and floors beyond this department to accommodate updated mechanical and exhaust systems. floor 1 [phase 3b]
- 3705 Medical Plaza · Hr 3705 Medical Parkway, LLCNov 13, 2026Austin kidney associates — renovation/alteration — a 7,972 sq ft tenant renovation for medical office use in austin medical plaza in austin, texas
- 2111 Rio Grande StNov 12, 2026Installation of new a/c unit -distributing into the elevator for floor 1
- 2222 Rio Grande StNov 12, 2026Replace fire pump motor and fire pump controller
- 2307 Rio Grande StNov 12, 2026Ventnor avenue (with r sp-2025-0235c)
- 2905 San Gabriel StNov 11, 2026Interior remodel to crate pilates studio. 2026-113312 da
- 2902 Medical Arts St · University Of Texas Law School FoundationNov 10, 2026Ut austin - law student housing
- 3501 Red River StNov 10, 2026St. paul lutheran church - parking addition
- 3707 Speedway · 38th & Speedway LPNov 10, 2026Rockman dos — renovation/alteration — interior finish-out of a bakery and coffee shop
- 2414 Pearl StNov 9, 20262026/11/20 | private event for members and invited guests. party and two tailgates
- 2515 Leon StNov 6, 2026Bp to cover both the 200 sq ft platform and the 64 sq ft platform 2026/10/31 & 2026/11/07 | halloween party: social gathering at the kappa alpha order house for halloween. y2k party: social gathering at the kappa alpha order house october 31st 20:00 - november 1st 02:00 y2k party; november 7th 20:00 - november 8th 02:00 #greek
Latest filings
- 501 24th StNov 18, 2026The arconia
- 408 W 33rd StNov 18, 2026Interior remodel: interior renovation to update all bathrooms and kitchen including replacement of surface materials such as drywall tile flooring cabinetry countertops paint trim lighting and plumbing fixtures. bedroom updates limited to flooring paint lighting and fixture replacement. (building 1 unit a & b)
- 3704 Grooms StNov 18, 2026Addition/ interior remodel of existing 1-story single-family residential to include: addition of a closet to primary bedroom; interior remodel consisting of reconfiguration of interior layout kitchen and bathroom window and door modifications
- 2008 San Antonio StNov 18, 20262008 san antonio street
- 710 W 28th StNov 18, 20262026/11/6 & 2026/11/20 & 2026/11/21 | zeta beta tau - production party on build friday nov 6: 9 pm-2 am. pat os on build friday nov 20: 8:30 pm-1:30 am. arkansas tailgate saturday nov 21: 10:30 am - 3:30 pm #greek
- 808 E 31st StNov 18, 2026Addition to existing 1-story single family residence with interior remodel. adding bedroom and kitchen 5 bed/4.5 bath retroactively permit attached covered carport
- 408 23rd StNov 17, 2026Villas 23sa
- 701 W 24th StNov 17, 2026First time tenant fit out for a restaurant
- 2831 San Gabriel StNov 16, 2026Interior remodel to existing duplex. unit a increasing existing 2 bedrooms to 4 bedrooms. bathrooms remodel of existing 2 baths. unit b increasing existing 2 bed 1 bathroom into 3 bedrooms 2 bathrooms and modified kitchen area. new driveway
- 1201 W 38th StNov 16, 2026This project consists of renovation on the ground floor of the existing ascension seton main campus hospital to expand and modernize the existing sterile processing department. alterations will also extend into areas and floors beyond this department to accommodate updated mechanical and exhaust systems. floor 1 [phase 3b]
- 612 W 33rd StNov 14, 2026Base: installing a backup battery system and additional meter socket
- 919 E 32nd StNov 13, 2026Remodel hospital - 2nd floor - surgery - with associated above and below ceiling/floor work. (2) applications
- 3705 Medical Plaza · Hr 3705 Medical Parkway, LLCNov 13, 2026Austin kidney associates — renovation/alteration — a 7,972 sq ft tenant renovation for medical office use in austin medical plaza in austin, texas
- 806 E 31st StNov 13, 2026Construct new driveway approach 20.9 ft. fee in lieu of sidewalk paid
- 305 Moore BlvdNov 12, 2026Pulled gas meter repair and test
- 2111 Rio Grande StNov 12, 2026Installation of new a/c unit -distributing into the elevator for floor 1
- 2222 Rio Grande StNov 12, 2026Replace fire pump motor and fire pump controller
- 2307 Rio Grande StNov 12, 2026Ventnor avenue (with r sp-2025-0235c)
- 2905 San Gabriel StNov 11, 2026Interior remodel to crate pilates studio. 2026-113312 da
- 807 W 30th StNov 11, 2026Eplan: residential expedited review - additon and remodel to existing single family res. scope of work to include interior remodel of existing basement and add to expand basement replace all windows like for like. replace exterior siding update electrical entry panel replace water heater to tankless exterior water heater
- 2829 Shoal Crest AveNov 10, 2026Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system with ductwork
- 2902 Medical Arts St · University Of Texas Law School FoundationNov 10, 2026Ut austin - law student housing
- 3501 Red River StNov 10, 2026St. paul lutheran church - parking addition
- 3707 Speedway · 38th & Speedway LPNov 10, 2026Rockman dos — renovation/alteration — interior finish-out of a bakery and coffee shop
- 2414 Pearl StNov 9, 20262026/11/20 | private event for members and invited guests. party and two tailgates
- 507 Elmwood PlNov 9, 2026Eplan: residential expedited review - new construction of a 1-story duplex [1bed 1bath]. unit 1b
- 2515 Leon StNov 6, 2026Bp to cover both the 200 sq ft platform and the 64 sq ft platform 2026/10/31 & 2026/11/07 | halloween party: social gathering at the kappa alpha order house for halloween. y2k party: social gathering at the kappa alpha order house october 31st 20:00 - november 1st 02:00 y2k party; november 7th 20:00 - november 8th 02:00 #greek
- 104 E 35th StNov 5, 2026Perform gas pressure test on both sides of a duplex building for the city to turn on the gas
- 108 W 33rd StNov 4, 2026New garage second story addition and interior remodel to existing accessory structure to rear of sfr. existing driveway on 34th to be widened
- 316 W 34th StNov 3, 2026Install 5.7kw rooftop solar system to existing residential adu only
Questions about 78705
What is being built in 78705?
341 Austin addresses in 78705 had a building permit or project filing in the past 12 months, out of 618 on record. The most active project types are demolitions (74), restaurants (53), offices (40). The latest filing here was November 13, 2026.
What new commercial projects are in Austin 78705?
Recent commercial filings include 501 24th St, 2008 San Antonio St, 408 23rd St.