Self-storage Phase 2 planned at 5307 Graceland Drive
A one-story, 45,753-square-foot self-storage Phase 2 is planned at 5307 Graceland Drive in Midland. The Texas Department of Licensing and Regulation project registration was filed August 30, 2024, and lists an estimated project cost of $2.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 30, 2024
- since Aug 30, 2024
- Largest scope
- 45,753 sf
- Estimated cost
- $2.5M
- state registration
Where this project stands
Under constructionJust A Closet Midland Phase 2
45,753 sq ft · $2.5M est.
- RegisteredAug 30, 2024
- Plan review
- ConstructionDec '24 – Feb '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectConstruct (1) one-story self storage phase 2. building to be slab on grade with metal stud construction, metal wall panels, and masonry veneer. mep to be included. — just a closet midland phase 2
TDLR project registrationNew ConstructionReview Complete45,753 sq ft$2.5M est.- Project #
- TABS2024026730
- Tenant / owner
- Just A Closet Midland Phase 2
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5307 Graceland Drive
What is being built at 5307 Graceland Drive in Midland?
A one-story self-storage building for Just A Closet Midland Phase 2 is listed as a new-construction project. The TDLR registration was filed August 30, 2024.
Is a new self-storage facility planned in Midland 79703?
A TDLR registration lists a 45,753-square-foot self-storage Phase 2 at 5307 Graceland Drive, Midland, TX 79703.
How large is the self-storage project at 5307 Graceland Drive?
The registered project is 45,753 square feet and is described as a one-story building.
What is the estimated cost of Just A Closet Midland Phase 2?
The applicant's TDLR registration estimates the project cost at $2.5 million. This is an estimate for the project, not a reported final cost.
When was the project at 5307 Graceland Drive filed?
The TDLR project registration was filed August 30, 2024. It is listed as Review Complete.
What materials are planned for the self-storage building?
The registration describes slab-on-grade and metal-stud construction, with metal wall panels and masonry veneer. It also says mechanical, electrical, and plumbing work is included.