9839 Highway 6
Missouri City, TX 77489 · Ll Sunflower Trading, Inc.
Navy Federal Credit Union interior build-out at Shops at Vicksburg
A 3,630-square-foot interior build-out for a new Navy Federal Credit Union is planned in an existing multi-tenant building at Shops at Vicksburg. The project was registered with TDLR on April 28, 2026, with an applicant-estimated cost of $1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 28, 2026
- since Apr 28, 2026
- Largest scope
- 3,630 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
Inspected · closing outNavy Federal - Missouri City, TX
3,630 sq ft · $1.0M est.
- RegisteredApr 28, 2026
- Plan review
- ConstructionJul '26 – Oct '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectNew interior tenant build out of a 3,630 s.f. space. the existing vacated space is located in an existing multi-tenant building. existing interior space to be demolished and rebuilt for a new navy federal credit union. — shops at vicksburg
TDLR project registrationRenovation/AlterationInspection Complete3,630 sq ft$1.0M est.- Project #
- TABS2026018861
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9839 Highway 6
What is being built at 9839 Highway 6 in Missouri City?
A 3,630-square-foot interior tenant build-out for a new Navy Federal Credit Union is planned in an existing multi-tenant building. The TDLR registration is TABS2026018861.
Is a new building being constructed at 9839 Highway 6?
The registration describes an interior build-out in an existing building, not construction of a new building.
How large is the Navy Federal project at Shops at Vicksburg?
The registered interior build-out covers 3,630 square feet.
How much will the Navy Federal build-out cost?
The applicant estimated the project cost at $1 million in the TDLR registration filed April 28, 2026.
When was the project at 9839 Highway 6 registered?
The project was registered with TDLR on April 28, 2026, under number TABS2026018861.
What is the status of the Navy Federal project in Missouri City?
The TDLR project record lists its status as Inspection Complete.