Historic · latest filing Sep 2024Commercial

215 S. First Street

Muleshoe, TX 79347 · City Of Muleshoe

Muleshoe project to replace South Main sidewalks and driveways

A Muleshoe downtown project will replace existing sidewalks and driveways along South Main Street, from East American Boulevard to East Avenue C, to provide ADA-compliant access from parking areas to store entrances. The TDLR project registration was filed on September 3, 2024, and lists the project as closed.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 3, 2024

Projects
1
1 filings
Latest filing
Sep 3, 2024
since Sep 3, 2024
Largest scope
1,600 sf
Estimated cost
$500K
state registration

Where this project stands

Completed

Muleshoe Downtown/Main Street TxCDBG Project

1,600 sq ft · $500K est.

  1. RegisteredSep 3, 2024
  2. Plan review
  3. ConstructionOct '24 – Apr '25
  4. Inspected
  5. Closed

Ran as a 6-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Remove and replace existing sidewalks and driveways along s. main street from e. american blvd. to e. avenue c to allow ada-compliant access from parking to store entrances. — n/a

    TDLR project registrationRenovation/AlterationProject Closed1,600 sq ft$500K est.
    Tenant / owner
    Muleshoe Downtown/Main Street Txcdbg Project
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 215 S. First Street

What is being built at 215 S. First Street in Muleshoe?

A TDLR registration for the Muleshoe Downtown/Main Street TxCDBG Project describes replacing existing sidewalks and driveways along South Main Street, from East American Boulevard to East Avenue C. The work is intended to provide ADA-compliant access from parking areas to store entrances.

When was the Muleshoe downtown project registered?

The TDLR project registration was filed on September 3, 2024. Its project number is TABS2025000130.

What work does the Muleshoe Main Street project include?

The registration describes removing and replacing existing sidewalks and driveways along South Main Street between East American Boulevard and East Avenue C.

Is the Muleshoe South Main Street project ADA-related?

Yes. The registration says the sidewalk and driveway work is intended to allow ADA-compliant access from parking areas to store entrances.

How much is the Muleshoe downtown project estimated to cost?

The TDLR registration lists an estimated project cost of $500,000. This is the applicant's estimate, not a confirmed final cost.

Is the Muleshoe Main Street project complete?

The TDLR record lists the project status as “Project Closed.” That status does not by itself confirm when construction was completed.