New parking structures in Navasota
1 addresses in Navasota have permits or project filings for parking structures in the last two years. The most recent was filed at 303 Teague Street.
Latest filings
- 303 Teague Street · Frank's Towing And RepairDec 19, 2025Frank's towing and repair — new construction — shop building with storage parking · 77868
- 208 S. Judson · Grimes CountySep 23, 2025St joseph health grimes county hospital parking lot — new construction — new parking lot · 77868
- 304 Frazier Street · Masterbuilt Ministries, Inc.Apr 17, 2025Masterbuilt kids early childhood center parking improvements — additions to existing building — parking lot with sidewalks · 77868
- 4149 Hwy 105 E · Navasota 105 Property LLCFeb 22, 2024Aurora 105 — new construction — a truck stop store with different fuel pump stations, parking, and detention · 77868
Questions
What parking structures are being built in Navasota?
1 addresses in Navasota have permits or project filings for parking structures in the last two years. The most recent was filed at 303 Teague Street. Others include 208 S. Judson, 304 Frazier Street, 4149 Hwy 105 E.
Which Navasota ZIP codes have the most new parking structures?
77868 (1).
How can I find out when a new parking project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new parking project permit is filed.