240 Seguin Ave
New Braunfels, TX 78130 · The Faust Hotel Lodging, The Faust Hotel
The Faust Hotel plans a remodel of its second through fourth floors
A 16,800-square-foot remodel of The Faust Hotel’s second through fourth floors is registered at 240 Seguin Ave. The TDLR registration was filed March 20, 2024, and describes removing interior partitions while retaining the elevator and stair core, structural columns and beams, and exterior walls.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 20, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Mar 20, 2024
- since Mar 20, 2024
- Largest scope
- 16,800 sf
- Estimated cost
- $3.5M
- state registration
Where this project stands
Finishing up · inspection nextThe Faust Hotel Lodging
16,800 sq ft · $3.5M est.
- RegisteredMar 20, 2024
- Plan review
- ConstructionMay '24 – Mar '26
- Inspectednow
- Closed
Scheduled to finish Mar 1, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
2 projectsHotel 2nd- 4th floor remodel. all existing interior partitions to be demoed with the exception of elevator and stair core, structural columns and beams, and exterior walls. — the faust hotel
TDLR project registrationRenovation/AlterationReview Complete16,800 sq ft$3.5M est.- Project #
- TABS2024014302
- Tenant / owner
- The Faust Hotel Lodging
- Design firm
- Pro
- Contact
- Pro
Hotel 1st floor remodel and entry addition. existing kitchen, one-story kitchen block, and bar is being stripped back to existing structural walls and remodeled. dining room is being maintained, but an entry addition is going on parking lot side. — the faust hotel
TDLR project registrationRenovation/AlterationReview Complete5,750 sq ft$1.3M est.- Project #
- TABS2023019448
- Tenant / owner
- The Faust Hotel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 240 Seguin Ave
What is being built at 240 Seguin Ave in New Braunfels?
A TDLR project registration describes a remodel of the second through fourth floors of The Faust Hotel. It lists 16,800 square feet of renovation work.
Is The Faust Hotel being remodeled?
A TDLR registration filed March 20, 2024, describes a hotel remodel on floors two through four. It says the existing interior partitions will be removed, with the elevator and stair core, structural columns and beams, and exterior walls retained.
When was the Faust Hotel remodel filed?
The project was registered with TDLR on March 20, 2024. Its registration number is TABS2024014302.
How much will the Faust Hotel remodel cost?
The TDLR registration lists an estimated project cost of $3.5 million. This is the applicant’s estimate, not a confirmed final cost.
How large is the Faust Hotel renovation?
The TDLR registration lists 16,800 square feet for the second- through fourth-floor remodel.