Permeable parking lot planned for Headwaters at the Comal
A 40,000-square-foot permeable parking lot is planned for Headwaters at the Comal at 333 E Klingemann St. A TDLR project registration filed February 28, 2025, describes removing the existing asphalt and replacing it with permeable pavers. The applicant’s estimated project cost is $1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 28, 2025
- since Feb 28, 2025
- Largest scope
- 40,000 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
Under constructionHeadwaters at the Comal
40,000 sq ft · $1.0M est.
- RegisteredFeb 28, 2025
- Plan review
- ConstructionJun '25 – Nov '26
- Inspected
- Closed
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectCreating a permeable parking lot across the klingemann street for the headwaters at the comal center. this lot is currently used for overflow parking and miscellaneous storage. the existing asphalt will be removed and replaced with permeable pavers. — parking facility
TDLR project registrationNew ConstructionReview Complete40,000 sq ft$1.0M est.- Project #
- TABS2025013020
- Tenant / owner
- Headwaters At The Comal
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 333 E Klingemann St
What is being built at 333 E Klingemann St?
A TDLR registration describes a 40,000-square-foot permeable parking lot for Headwaters at the Comal, replacing existing asphalt with permeable pavers. The registration, TABS2025013020, was filed February 28, 2025.
What is planned for the parking area at Headwaters at the Comal?
The project description says the area currently serves as overflow parking and miscellaneous storage. The existing asphalt is planned to be removed and replaced with permeable pavers.
When was the Headwaters at the Comal parking project registered?
The TDLR project registration was filed February 28, 2025. Its status is listed as Review Complete.
How large is the planned parking lot at 333 E Klingemann St?
The TDLR registration lists the project at 40,000 square feet.
What is the estimated cost of the Headwaters at the Comal parking project?
The applicant’s estimated cost in the TDLR registration is $1 million. This is an estimate for the project, not a reported final cost.
What is being planned near Bldg B & D on Klingemann?
At 333 E Klingemann St, a TDLR registration describes replacing existing asphalt with permeable pavers for a parking lot serving Headwaters at the Comal. The registration was filed February 28, 2025.
Also being built nearby
All of 78130- 333 E Klingemann Dr · Bldg B & DJun 9, 2025Headwaters at the comal - phase 3 west — renovation/alteration — the scope of work includes but is not limited to removal of existing asphalt, concrete, road base and planting several native species of plants, trees and shrubs. improving drainage and altering existing structure for better storage and education
- 631 Lakeview Blvd · Eden Hill CommunitiesNov 7, 2024Eden hill communities - bistro renovation — renovation/alteration — minor interior renovation of bistro and associated dining area within the wellness center at eden hill communities. work includes new food service equipment and interior finishes. work does not involve any renovations to the exterior of the building · 463 m away
- 652 N. Houston Ave · L J Castle Hills Venture LtdNov 7, 2025Mind color autism new braunfels - tenant finish out — renovation/alteration — tenant finish out of 5,361 sq ft office area. replace flooring with new lvt per plan. touch up paint as needed. replace ceiling tile per plan. replace all light fixtures with led lighting. demolish walls and cabinets per plan · 547 m away
More warehouses & industrial in 78130, parking structures in 78130.