groundranger
Historic · latest filing Jun 2024Commercial

17610 US Highway 59

New Caney, TX 77357 · Proposed Do-Nut Shop, Proposed C-Store & Lease Spaces

Convenience store, lease spaces and do-nut shop proposed

TDLR project registrations dated June 12, 2024, describe a new convenience store with future lease spaces and a fuel canopy at 17610 US Highway 59, along with an interior build-out for a do-nut shop. The do-nut shop registration names Shipley Do-Nuts; both registrations show a status of Review Complete.

Summarized from Texas Department of Licensing and Regulation records · updated Jun 12, 2024

Projects
2
2 filings
Latest filing
Jun 12, 2024
since Jun 12, 2024
Largest scope
7,447 sf
Estimated cost
$1.6M
state registration

Where this project stands

Finishing up · inspection next

PROPOSED DO-NUT SHOP

1,752 sq ft · $76K est.

  1. RegisteredJun 12, 2024
  2. Plan review
  3. ConstructionSep '24 – Mar '25
  4. Inspectednow
  5. Closed

Scheduled to finish Mar 11, 2025; the state inspection hasn't been filed yet.

4 contacts on this project · 2 phone numbers

Permit & project history

2 projects
  1. Interior build-out to be a do-nut shop. — shipley do-nuts

    TDLR project registrationNew ConstructionReview Complete1,752 sq ft$76K est.
    Tenant / owner
    Proposed Do-Nut Shop
    Design firm
    Pro
    Contact
    Pro
  2. This project consists of new construction of a convenience store with future lease spaces & fuel canopy system. — proposed c-store & lease spaces

    TDLR project registrationNew ConstructionReview Complete7,447 sq ft$1.6M est.
    Tenant / owner
    Proposed C-Store & Lease Spaces
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 17610 US Highway 59

What is being built at 17610 US Highway 59 in New Caney?

TDLR registrations describe a convenience store with future lease spaces and a fuel canopy, plus an interior build-out for a do-nut shop. Both projects were registered June 12, 2024.

Is there a Shipley Do-Nuts planned for 17610 US Highway 59?

A June 12, 2024, TDLR registration describes an interior build-out for a do-nut shop and names Shipley Do-Nuts. The registration is TABS2024020695.

Is a new gas station planned in New Caney 77357?

A TDLR registration for 17610 US Highway 59 describes a new convenience store with a fuel canopy and future lease spaces. The project is listed as TABS2024020691, registered June 12, 2024.

Will 17610 US Highway 59 have space for other businesses?

The convenience-store project description includes future lease spaces. The TDLR registration does not name tenants for those spaces.

What are the project registration numbers for 17610 US Highway 59?

The convenience store and lease-space project is TABS2024020691. The do-nut shop interior build-out is TABS2024020695; both were registered June 12, 2024.

Have the projects at 17610 US Highway 59 been approved?

Both TDLR registrations show the status “Review Complete.” The records describe the proposed work but do not state that construction is complete.

More gas stations & car washes in 77357, retail spaces in 77357.

Email me when it passes inspection