groundranger
Recent · latest filing Jul 2025Commercial

5555 Rufe Snow Drive

North Richland Hills, TX 76180 · Aberfeldy Properties, Inc.

Remington College plans 4,108-square-foot interior expansion

A 4,108-square-foot interior expansion of Remington College is planned at 5555 Rufe Snow Drive. The TDLR project was registered on July 29, 2025, and calls for selective demolition in Suite 120 and new white-box construction to expand the college’s existing Suite 150. The applicant’s estimated project cost is $190,000.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 29, 2025

Projects
1
1 filings
Latest filing
Jul 29, 2025
since Jul 29, 2025
Largest scope
4,108 sf
Estimated cost
$190K
state registration

Where this project stands

Completed

Interior Remodel/Expansion for Remington College

4,108 sq ft · $190K est.

  1. RegisteredJul 29, 2025
  2. Plan review
  3. ConstructionAug '25 – Oct '25
  4. Inspected
  5. Closed

Ran as a 2-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Selective demolition of existing 4108 sq ft interior tenant spacem suite 120. new white box construction to create a 4108 sq ft interior expansion of existing 18,625 sq ft remington college suite 150. — remington college

    TDLR project registrationRenovation/AlterationProject Closed4,108 sq ft$190K est.
    Tenant / owner
    Interior Remodel/Expansion For Remington College
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 5555 Rufe Snow Drive

What is being built at 5555 Rufe Snow Drive?

TDLR records describe a 4,108-square-foot interior expansion of Remington College, with new white-box construction connecting to its existing Suite 150. The project was registered July 29, 2025.

Is Remington College expanding in North Richland Hills?

Yes. The TDLR registration describes a 4,108-square-foot interior expansion of Remington College at 5555 Rufe Snow Drive. The listed project status is closed.

When was the Remington College expansion permitted?

The project was registered with TDLR on July 29, 2025. Its registration number is TABS2025024640.

What work is planned inside 5555 Rufe Snow Drive?

The project description calls for selective demolition of 4,108 square feet of tenant space in Suite 120, followed by new white-box construction to expand Remington College’s Suite 150.

How much will the Remington College expansion cost?

The applicant’s estimated cost for the project is $190,000, according to the TDLR registration. This is an estimate, not a confirmed final cost.

What is being built near Rufe Snow Plaza II?

At 5555 Rufe Snow Drive, about 56 meters from Rufe Snow Plaza II, TDLR records describe an interior expansion of Remington College. The project was registered July 29, 2025.

Also being built nearby

All of 76180

More demolitions in 76180.

Get alerts for 5555 Rufe Snow Drive